My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 11:02:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
614
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
an®�® <br />�E." <br />5.4 <br />� <br />" <br />���MMi <br />103 <br />DRAINAGE CALCULATIONS <br />PROJECT TITLENorth County <br />Landfill REFERENCE DRAWING: <br />RETURN PERIOD: 100- yr <br />4.0 <br />CALCULATIONS BY: ESA <br />PROJECT NUMBER: <br />118040101000000 <br />15.9 <br />24' CMP Downdrain <br />DESCRIPTION OF WORK: Drainage Calculations 130°/ Design) -East Perimeter Ditch <br />CHECKED BY: <br />�m.������lllll� <br />8.7 <br />GUTTER(CHANNEUCONO UIT TRAVEL TIME <br />SLOPE MANNING HPDR. VELOCITY OVERLANC GUTTER <br />n RADIUS V TI CHANNEL <br />LF Bench w/ Drainage Ditch <br />DESIGN DRAINAGE RUNOFF <br /># <br />POINT I.D. AREA COEFF. <br />C <br />CTA SUM (A) COMP. OVERLAND <br />- <br />COEFF. LENGTH SLOPE LENGTH <br />C L L <br />RAINFALL DISCHARGE <br />TIME OF TOTAL INTENSITY SUBAREA TOTAL <br />CONC. TC I Qa at <br />24' CMP Downdrain <br />CONDUIT <br />Tc <br />(acres) <br />(acres) (aces) (Leap (iVlt) deep <br />(ft/1t) feet <br />( ) ((Vast) (min.) <br />Tp <br />(min.) <br />{mint (1Mn.) (Irmo") (ds) <br />an®�® <br />�E." <br />5.4 <br />� <br />" <br />���MMi <br />103 <br />18' CMP Dwmdrain-- <br />4.88 <br />7.9 <br />4.0 <br />LF Bench w/ On*tage Ditch <br />15.9 <br />24' CMP Downdrain <br />�m.������lllll� <br />8.7 <br />4.3 <br />LF Bench w/ Drainage Ditch <br />25.0 <br />24' CMP Downdrain <br />4.73 <br />102 <br />5.1 <br />LF Bench w/ Drainage Ditch <br />35.1 <br />30' CMP Downdrain <br />9 <br />DATE: 12 Jul 07 <br />DATE: <br />DRAINAGE FACILITIES <br />3.22 <br />�E." <br />5.4 <br />� <br />" <br />���MMi <br />103 <br />18' CMP Dwmdrain-- <br />4.88 <br />7.9 <br />4.0 <br />LF Bench w/ On*tage Ditch <br />15.9 <br />24' CMP Downdrain <br />�m.������lllll� <br />8.7 <br />4.3 <br />LF Bench w/ Drainage Ditch <br />25.0 <br />24' CMP Downdrain <br />4.73 <br />102 <br />5.1 <br />LF Bench w/ Drainage Ditch <br />35.1 <br />30' CMP Downdrain <br />4.67 <br />9.2 <br />4.6 <br />Perimeter Bench w/ Ominege Ditch <br />442 <br />30' CMP Downdrain <br />4.255.0 <br />Perimeter flow <br />3.86 <br />48.1 <br />Combined O <br />9 <br />DATE: 12 Jul 07 <br />DATE: <br />DRAINAGE FACILITIES <br />3.22 <br />10.7 <br />5.4 <br />Downdrain - DD2 <br />Dlvervon Berm w/ D_rai�wge D- <br />103 <br />18' CMP Dwmdrain-- <br />4.88 <br />7.9 <br />4.0 <br />LF Bench w/ On*tage Ditch <br />15.9 <br />24' CMP Downdrain <br />�m.������lllll� <br />8.7 <br />4.3 <br />LF Bench w/ Drainage Ditch <br />25.0 <br />24' CMP Downdrain <br />9 <br />DATE: 12 Jul 07 <br />DATE: <br />DRAINAGE FACILITIES <br />3.22 <br />10.7 <br />5.4 <br />Downdrain - DD2 <br />Dlvervon Berm w/ D_rai�wge D- <br />103 <br />18' CMP Dwmdrain-- <br />4.88 <br />7.9 <br />4.0 <br />LF Bench w/ On*tage Ditch <br />15.9 <br />24' CMP Downdrain <br />4.73 <br />8.7 <br />4.3 <br />LF Bench w/ Drainage Ditch <br />25.0 <br />24' CMP Downdrain <br />4.73 <br />102 <br />5.1 <br />LF Bench w/ Drainage Ditch <br />35.1 <br />30' CMP Downdrain <br />4.67 <br />9.2 <br />4.6 <br />Perimeter Bench w/ Ominege Ditch <br />442 <br />30' CMP Downdrain <br />4.255.0 <br />Perimeter flow <br />3.86 <br />48.1 <br />Combined O <br />322 <br />23.0 <br />11.5 <br />Downdraln - DD1 <br />Diversion Berm wl Orange Ditch <br />23.0 <br />24' CMP O-ndraln <br />4.88 <br />15.0 <br />7.5 <br />32.9 <br />LF Bendy -w/ Dratrrege Ditch <br />30' CMP Downdrain <br />4.73 <br />- 11.6 <br />5.8 <br />44.6 <br />LF Bench w! Otalnage Ditch <br />30' CMP De -drain <br />4.73 <br />11.6 <br />5.8 <br />56.2 <br />LF Bench w/ Drainage Ditch <br />36' CMP Downdra(r1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.