My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 11:02:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
614
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. MICHAEL CARROLL, PE <br />COUNTY OF SAN JOAQUIN DEPARTMENT OF PUBLIC WORKS <br />DECEMBER 22, 2009 <br />• 24 -inch operations layer <br />Critical Interfaces: <br />— Smooth side of HDPE geomembrane-geonet <br />— Geonet-geotextile <br />Module 4 and Future Modules <br />Base Liner (starting from the bottom): <br />• 12 -inch compacted soil layer <br />• Geosynthetic clay liner (GCL) barrier <br />• 60 -mil double -sided textured HDPE geomembrane <br />• 9 -inch -thick drainage layer <br />• 8 oz/ yd non -woven geotextile separator <br />• 24 -inch -thick operations soil layer <br />Critical Interfaces: <br />— GCL-textured HDPE geomembrane <br />Side Slope Liner (starting from the bottom): <br />• 6 -inch compacted soil layer <br />• GCL <br />• 60 -mil double -sided textured HDPE geomembrane <br />• Geocomposite drain <br />• 24 -inch -thick operations soil layer <br />Critical Interfaces: <br />— GCL-textured HDPE geomembrane <br />— Textured HDPE geomembrane-geocomposite drain <br />— Geocomposite drain -operations soil <br />While the interface shear test data provided in Appendix E of the 2007 report indicated the smooth <br />HDPE geomembrane/geonet and geonet/non-woven geotextile interfaces of Modules I and 3 have large <br />displacement friction angles > 12 degrees, experience indicates typical friction angles of about 10 <br />degrees for these interfaces. Therefore, to be conservative, a friction angle of 10 degrees and zero <br />adhesion was assumed for the 2007 stability analyses. <br />A double -sided textured HDPE geomembrane was used for the liner system in Module 4 in lieu of the <br />single -sided textured geomembrane in Module 3 and will be used in all future modules (5 through 11). <br />The double -sided textured HDPE geomembrane/GCL interface is the most critical. <br />As agreed at the August 31, 2009 meeting, we designed a testing regime to obtain liner interface data for <br />the slope stability analyses of Modules 5 through 11 for normal stresses that will occur as currently <br />proposed. The critical interface is either between the textured geomembrane and the GCL or internal <br />PAGE 4 <br />J <br />O <br />
The URL can be used to link to this page
Your browser does not support the video tag.