W. MICHAEL CARROLL, PE <br />COUNTY OF SAN JOAQUIN DEPARTMENT OF PUBLIC WORKS <br />DECEMBER 22, 2009 <br />and were sheared at a rate of 0.04 inch/minute. Each test was either soaked at the testing normal stress <br />for 72 hours or soaked at a reduced normal stress (0 to 1440 psf) for at least 24 hours and consolidated. <br />These are conservative or comparable hydration conditions compared to those specified in Table 1, <br />where specimens are specified to hydrate at the testing normal stress for 48 hours. The failure plane, in <br />all cases, Was not internal to the GCL. As previously discussed, we will modify the GCL specifications <br />for all future modules to attempt to avoid internal GCL failure. The specifications will continue to <br />require the shear strengths shown in Table 1 based on a friction angle of 12 degrees. <br />Note interface shear strength testing of liner materials during constriction for all future modules (5 <br />through 11) will be up to a maximum normal stress of 20,000 psf as stated in Section 9.2.1 of Appendix <br />E. Technical specifications that will be developed for construction of each module will mimic these <br />requirements. If any test results during module construction fall below the values assumed in Appendix <br />E or this analysis, the affected sections will be re -analyzed. As is typical, the RWQCB will be kept <br />apprised of construction activities and any variances from the approved design. <br />Note 2 of Appendix E, Geotechnical Analyses for the Vertical Expansion of North County <br />Recycling Center and Sanitary Landfill, indicates a friction angle of 13 degrees. I believe this <br />should be 12 degrees. <br />Agreed: Note 2 of Table 3 in Appendix E should read 12 degrees. This is a misprint. The required large - <br />displacement shear strengths in Table 3 are based on a friction angle of 12 degrees. A revised Table 3 is <br />attached. 0 <br />Seismic Hazard Report <br />Attachment C of Appendix E, Geotechnical Analyses for the Vertical Expansion of North County <br />Recycling Center and Sanitary Landfill, contains the estimate of the MPE ground motions for the <br />North County Site by Dr. Norman Abrahamson dated June 18, 2007. <br />Based on the known faults in the area, the estimated peak ground acceleration for the site is low. <br />Values of peak acceleration are 0.1g and 0.098 for the CRCV and San Andreas Fault systems, <br />respectively. As a check, DWR staff performed some simplified probabilistic analyses for the site <br />using the USGS website. <br />DWR staff recommends that some simplified deformation analyses be performed for the landfill <br />using the Makdisi Seed method (1977) or Computer Program Displace. DWR staff feels that <br />Dr. Abrahamson's findings are accurate given the known faults and MPE loading assumed. DWR <br />staff, however, recommends that consideration be given to increasing the design earthquake <br />loading to 0.15g. DWR feels this increase is warranted given the height of the embankment, the <br />results of the simplified USGS analyses performed by DWR, and the possibility that a small <br />earthquake, such as a M 5.5 or 6, can occur almost anywhere in California. The Makdisi Seed <br />method evaluates deformation for Magnitude 6.5, 7.5, large 8.5 (Richter) magnitude earthquake <br />events. If the Makdisi-Seed method is performed, the lower bound fault range should be assumed. <br />The yield accelerations for all sections were recalculated based on configuration and material property <br />updates discussed above. Using the yield accelerations from the revised analyses, seismic displacement <br />was calculated using the Makdisi-Seed method using the lower -bound curve for a Magnitude 6.5 <br />PAGE 8 <br />