Laserfiche WebLink
Unit Cost Basis <br />Description <br />North Coun <br />Quantity <br />PCP Unit Pricing <br />Units Unit Cost <br />No County <br />Quantity Units <br />Module 4 - 2003 <br />Unit Cost $ <br />Median 2009* <br />Quantity <br />Kiefer Module 3 - 2007 <br />Units Unit Cost $ <br />Median 2009' <br />Quantity <br />Fink LF 2, Cell 5 - 2009 <br />Units Unit Cost $ <br />Median 2009* <br />Preparation for Cover Placement <br />185 <br />AC <br />500 <br />645 ,000 <br />15 <br />SF <br />AC <br />0.26' <br />11,326 <br />0.30_.€, <br />13,057 <br />52 <br />AC <br />1050 <br />=".. <br />1,102 <br />;' : Ef ,.' , t. t% , ��7 * 7777, <br />Place additional 1 ft Foundation Later <br />313,300 <br />CY <br />4 <br />Place GCL Barrier <br />8,461,500 <br />SF <br />0.65 <br />670,000 <br />SF <br />0.52 <br />0.60 <br />2,503,400 <br />SF <br />0.68 <br />0.71 <br />824,700 <br />SF <br />0.65 <br />0.65 <br />Place Geocomposite Drainage Layer <br />over 20% of the GCL <br />1,692,300 <br />SF <br />0.6 <br />260,000 <br />SF <br />0.47 <br />0.54 <br />828,252 <br />SF <br />0.50 <br />0.52 <br />16,100 <br />SF <br />0.63 <br />0.63 <br />Place 1.5 ft Vegetative Soil Cover <br />470,000 <br />CY <br />4 <br />Hydroseedin2 <br />185 <br />AC <br />3,500 <br />22 <br />AC <br />2,163 <br />2,493 <br />61 <br />AC <br />1,473 <br />1 546 <br />68 <br />AC <br />1,410 <br />1410 <br />Soil Excavation <br />CY <br />1.5 <br />2,332,600 <br />CY <br />1.75 <br />1.84 <br />11327,300 <br />CY <br />1.37 <br />1.37 <br />Earthfill <br />CY <br />1.5 <br />28,735 <br />CY <br />1.05 <br />1.10 <br />1,700 <br />CY <br />2.16 <br />2.16 <br />GW Well <br />LF <br />75 <br />130 <br />LF <br />73.40 <br />73.40 <br />6" HDPE Pie <br />LF <br />15 <br />400 <br />LF <br />20.25 <br />23.35 <br />4,193 <br />LF <br />15.00 <br />15.74 <br />1,670 <br />LF <br />13.00 <br />13.00 <br />18" CMP <br />LF <br />70 <br />780 <br />LF <br />67.57 <br />70.92 <br />36" CMP <br />LF <br />100 <br />330 <br />LF <br />100 <br />105 <br />LFG Probes <br />LF <br />150 <br />:a� <br />"" LF ` <br />125 <br />'' #!4 ':. <br />Leachate Dischar a Pump <br />1 <br />EA <br />5,400 <br />6,225 <br />Chain Link Fence <br />LF <br />25 <br />Clearing and Grubbing <br />Subgrade Preparation (converted from SF to AC) <br />Subgrade Preparation (converted from SF to AC). Averaged from side slope and base items. <br />Single Probe Wells <br />Triple Probe Wells <br />SDR 15.5 <br />ATTACHMENTS: <br />North County Module 4 Bid Summary <br />Kiefer Module 3 Bid Summary <br />Fink Road Cell 5 Bid Summary <br />* Inflation Adiustment (CIWM8) <br />Year Factor 2009$ <br />20031.017 <br />1.153 <br />2004 e <br />1.021 <br />1.134 <br />2005 <br />1.028 <br />1.110 <br />2006 <br />1.029 <br />1.080 <br />2007 <br />1.027 <br />1.050 <br />2008 <br />1.022 <br />1.022 <br />2009 <br />1 <br />O:\San Joaquin County\NCRCSL\118040\PCPMP\Final Report\ North County <br />Cost Backup-071009.xis 1 of 1 Jan. 13, 2010 <br />