|
SUMMARY OF BIDS OPENED April 01, 2009 at 2:30 P,M.
<br />Stanislaus County Fink Road Landfill
<br />Landfill 2, Cell No, 5, Construction Project
<br />Item No,
<br />1
<br />2 -La
<br />3
<br />Item
<br />Mobilization and Demobilizaticn
<br />youtdWork and Surveys--
<br />Eadh81l
<br />Teichcrc
<br />Conmuction
<br />Raminha Construetion,
<br />lac
<br />Whitaker Gonvaclnrtnc
<br />Siem Equipment Rental, ine.
<br />Grana. Cautrucdae
<br />Co.
<br />Unit of
<br />Measure
<br />L$
<br />Estimated
<br />Quantity
<br />7
<br />Item Pd-
<br />(Figures)
<br />$441.000.00
<br />St00.W0A0
<br />$3.00
<br />Tota(
<br />(Figures)
<br />$441,000.00
<br />$100,000.00-ga0,000.00
<br />$5,100.00
<br />Item Price
<br />(F9ures)
<br />5400,000.00
<br />$5.00
<br />$1.37
<br />$850
<br />$0.02
<br />$0.67
<br />$0.51
<br />Total
<br />(Figures)
<br />5400,000.00
<br />aa0,000.00
<br />Item Price
<br />(Figures)
<br />$280,000.00
<br />522,000.00_
<br />Total
<br />(Figures)
<br />$280,000.00
<br />S22,OW.00
<br />Item Price
<br />(Figures )
<br />5220,000.00
<br />630,000.00
<br />Total
<br />(Figures)
<br />$220,000.0
<br />b3Q000.00
<br />Item Prioe
<br />(Figures)
<br />$231,000.00
<br />$24.000.00
<br />Total
<br />(Figures)
<br />5231,000.00
<br />$id.oW.00
<br />LS
<br />CY
<br />1-
<br />1,700
<br />1,327,300
<br />785,500
<br />824,700
<br />4
<br />5-
<br />6
<br />7
<br />____._
<br />8
<br />_ _ -
<br />Excava5on --- - --
<br />low Permeability Sob Layer
<br />Subgrade Preparation
<br />(S) Gensynlhe5c Cby Liner
<br />__
<br />(S) 60 mil HDPE Geomembrane
<br />-Cy
<br />CY20,600-�
<br />SF
<br />SF
<br />$1.15
<br />$225
<br />$0.10
<br />50.7a
<br />50.56
<br />$1,526,395.00
<br />546,350.00
<br />$78,550.00
<br />8610278.00
<br />5466,480.00
<br />58.500.0 S200 $3,400. 51.00 $1,700.00 84.00
<br />56,800.00
<br />$1.818,401.00 11.62 _-- 52,150226. $1.75 52,322,775.00 $225
<br />5775,100.00$70,040.00 $750 $154,500.00 $200
<br />615,710.00 $0.12 --694,260. 5025 $196,375.00 $0.12
<br />$552,549.00 60.69 $569,043.00 $0.62 5511,314.00 50.62
<br />$424,830.00 $0.53 $441,490,00 $0.48 $399,840.0 •
<br />52,986,425.00
<br />$d1,200.00
<br />594,260.00
<br />3517,314,00
<br />5F
<br />833,000
<br />9
<br />10
<br />11
<br />(S)GeocomPoslte Drainage Layer (5)--
<br />11-
<br />(S) G Dminle a Gna(S)__^__
<br />LCR$ Drainage Gravel
<br />Sump Gravel
<br />Base operations layer ---
<br />Side Slope OpmWns Oyer Stockpihn9
<br />Side Slope Oper46ons Layer Placement
<br />6-)nch Diamter SDR 15.5 HPDE Pipe
<br />84nU Diameter SDR 17.0 HDPE P(pe
<br />12-Mch Diamter SDR 15.5 HPDE Pipe
<br />184nch Diamler SDR 15.5 HPDE PP=Pe
<br />SF
<br />5F
<br />CY
<br />CY
<br />-Cy
<br />CY
<br />CY
<br />LF
<br />LF
<br />LF
<br />LF
<br />16,100
<br />480,000
<br />8,770
<br />85575.00
<br />35,700 -
<br />23,600
<br />14100
<br />1,670
<br />925
<br />350
<br />180
<br />$0,14
<br />$40.00
<br />-- - 52.90
<br />57.50
<br />$2.25
<br />$2200
<br />$26.00
<br />570.00
<br />$90.00
<br />--- --$6000---S21-,000.00--
<br />$11,431.00
<br />$67,200.00
<br />$350,800.00
<br />$6.375.00
<br />S103.530.D0
<br />335,400.00
<br />--
<br />522,725.00
<br />536,740.00
<br />$22200.00
<br />524,500.00
<br />516,200.00
<br />50.65
<br />$0;13
<br />$38.00
<br />5130.00
<br />$7.50
<br />$4.00
<br />$10.00
<br />$13.00$21,720.00
<br />-' 520.00
<br />$38.0()
<br />567.00
<br />$46.00
<br />$5,0060-0
<br />$8.00
<br />$10,465.0
<br />562,400.
<br />5333,260.
<br />$11,050.00
<br />$257,750.00
<br />594,400,00
<br />$107,000.
<br />518.500.00
<br />513,300.00
<br />$12,060.00
<br />Si6J0o.00
<br />__ SO.6fi
<br />50.13
<br />$34.00
<br />$58.00
<br />_-- $3.60
<br />50.80
<br />--
<br />$320
<br />$16.00
<br />$16.00
<br />moo
<br />584.00
<br />588.00
<br />$10,625.00
<br />582,400.00
<br />5298,180.00
<br />$4,930,00
<br />$128,520,00
<br />118,880.00
<br />$32,320.
<br />$26,720.
<br />$14,800,00
<br />$18,800.00
<br />$15.120.00
<br />530,800,0
<br />50.60
<br />b0.12
<br />moo
<br />$50.00
<br />$325
<br />$1.50
<br />$4.00
<br />$25.00
<br />Sd0.00
<br />$200.00
<br />$150.00
<br />560.00
<br />$9,660.(30
<br />$57.600.00
<br />5350,800.00
<br />$4250.06
<br />4116,025.0
<br />$23,600,
<br />$40,4pp.00
<br />$41,750.00
<br />637,000.00
<br />$35,000.00
<br />327,000.00
<br />521,000.00
<br />$0.48
<br />50.80
<br />$0.12
<br />$40.00
<br />$40.00
<br />$1.90
<br />$1.00
<br />$225
<br />512.00
<br />$7200
<br />S5200
<br />$90.00
<br />$W DO
<br />$399,840.00
<br />$9,660.00
<br />$57,600.00
<br />$350,800,00
<br />$3,400.00
<br />$67,830,00
<br />$23.600.00
<br />622.725.00
<br />$20,D40.00
<br />415,725.00
<br />$18.200.00
<br />516,200.00
<br />528.000.00
<br />12
<br />13
<br />- 14A
<br />14B
<br />__ _
<br />15
<br />16
<br />77
<br />16
<br />19
<br />Ya -ch Diameter CMP
<br />LF
<br />-_ 350
<br />20
<br />21
<br />afoot Diameter SOR 17.0 HDPE Manhole
<br />Fxpose and Prepare EdstMg Geomembmne Liner
<br />EA
<br />LF
<br />1
<br />2550
<br />50
<br />$6,0.00
<br />85.00
<br />56,50o.o0
<br />$12.750.00
<br />65,000.00 54,000.00 - $4,000.00 55,000.00 55,000.00 52500.00
<br />$20,400. $5.50 5/4,025.0 610.00 $25,500.00 54.00
<br />$2.500.00
<br />510,200.00
<br />22
<br />23
<br />24
<br />25
<br />26
<br />27
<br />28
<br />29
<br />Perimeter and Side Slope Anchor Trenches
<br />(5) Underground Electrical Conduit and Widng
<br />LF
<br />---CS-
<br />3,350
<br />5/5.00
<br />---i65 000 .00
<br />$50,250.00
<br />56 5.000.00
<br />$7.00
<br />$20.000.00
<br />520,000.00
<br />$7,500.00
<br />$16,500.00
<br />$1,250.00
<br />$2.00
<br />540.00
<br />53,000.00
<br />52.00
<br />$3,500.00
<br />$8,500.00
<br />$5,5W.00
<br />523,450.00
<br />520,0000
<br />57.20
<br />613.000.00
<br />$24,120.00
<br />$13.000,00
<br />- $15.00
<br />5125.000.00
<br />$50,250.00
<br />$125,000.00
<br />$18.00
<br />565,000.00
<br />$60,300.00
<br />565,000.00
<br />(S) a-4, a1 Connecions and Pumps
<br />Concrete Spilt Prevention Pads
<br />Re leak Location Survey
<br />RevegetationlHydrosaeding
<br />Silt -Fe-m-
<br />Class 2 Road Base
<br />selective DeaGUon
<br />Ddch Excavation
<br />Rlp Rap _
<br />Slormwater Potlution Prevention Plan
<br />Abandonment of Existing Groundwater Monitoring
<br />Wells 10 and 11
<br />LS
<br />F�1
<br />EA
<br />AC
<br />LF
<br />CY
<br />LS
<br />LF
<br />LS
<br />LS
<br />LS
<br />1
<br />1
<br />1
<br />68
<br />7,100.
<br />200
<br />1
<br />4.500
<br />1
<br />1
<br />1
<br />560,000.00
<br />52.000.00
<br />526.400.00
<br />$1,500-00
<br />$230
<br />$50.00
<br />$5,000.00
<br />$4.00
<br />$8,000.00
<br />$7,500.00
<br />$7,500.00
<br />560,000.00
<br />- $2,000.00
<br />526,400.00
<br />5102,000.0
<br />$16,330.00
<br />$10,000.00
<br />$5,000.00
<br />S18,000.00
<br />$8,000.00
<br />$7,500.00
<br />$7,500.00
<br />$20,000.60 516,000.00 $16.000.00 -$15,000 DO $15.000.00 $80,000.00
<br />$7,500.0 00
<br />57,0.00 37,000.00 S1,500.D0 $1,500.0 $3,000.00
<br />516,500.00 519,000.00 $19,000.00 $15,000.00 $15,000.0 $20,000.00
<br />385,000.00 $1,410.00 595,880. 51,620.00 $110,160.00 $1200.00
<br />$14,200.00 5220 $15,620.00 $3.00 $21,300.00 $1.10
<br />58,000.00 654.00 $10,800.00 $50.00 $20,000.00 W.0058,000.00
<br />$3,000.00 55,500,00 $5,500.00 351000.00 55,000.00 $5,000.00
<br />$9,000.00 $250 511,250.00 3325 $14,625.0 $200
<br />13,500.00 $5,000.00 $5,000.00 $2,500.00 32,500.00 $6,000.00
<br />$8,500.00 , 522,000.00 522,000.0 $5,000.00 $5X0400 $2,000.00
<br />55,500.00 $6,900.00 $6,900.0 $15,000.00 $15,000.00 $7,000.00
<br />560,000,00
<br />$3,000.00
<br />520,000.00
<br />$81,600.110
<br />$7,810.00
<br />35.000.00
<br />59,000.00
<br />66,000.00
<br />52000.00
<br />$7,000.00
<br />30
<br />31
<br />32
<br />33
<br />34
<br />35
<br />Installation of GmUndwater Monitodng Welts25and
<br />26
<br />LF
<br />730
<br />5700.00
<br />$13,000.00
<br />575.00
<br />$9,750.00
<br />$87.00
<br />$11,310.00
<br />565.00
<br />$8,450.00
<br />5720.00
<br />515,600.00
<br />36
<br />Transport of Wafer ' -
<br />1,000 gal
<br />units
<br />23,500
<br />units
<br />$1.00
<br />$13,500.00
<br />514.00
<br />$189,000.00
<br />571.00
<br />$297,000.00
<br />$050
<br />$6,750.00
<br />$10.00
<br />$135,000.00
<br />64,415,984.00
<br />54,845,385.00
<br />54,868,960.00
<br />$5,036,624.00
<br />55,426,629.00
<br />D:18ed.eope%Ucal SeningATempertry 7ntemet Fila\OLKA2lSumnmry cw.xls
<br />Page 3 of 4
<br />
|