Laserfiche WebLink
L <br />C7 <br />Both the initial construction and final cover and any later repair work that involves the cover low <br />hydraulic conductivity layer (if present) will be completed in accordance with an approved <br />construction quality assurance plan. <br />North County RC&SL <br />Joint Technical Document <br />Page 30 of 68 Public Works/Solid Waste <br />County of San Joaquin — October 10, 2014 <br />