My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2014-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2014-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:13:50 PM
Creation date
7/3/2020 11:02:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2014-2016
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2014-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Taj M. Bahadori -2- 21 January 2016 <br /> San Joaquin County DPW <br /> Stockton <br /> A LCRS functionality test was also conducted in accordance with the approved work plan to verify <br /> that the LCRS was functioning properly. The test included the injection of tracer (water colored <br /> with dye) directly into the LCRS gravel immediately upstream of the repaired area after which the <br /> LCRS sump was checked for recovery of the tracer. The test results indicated that the LCRS was <br /> functioning properly. After completion of the LCRS test, the portion of the operations Layer <br /> removed to allow injection of the tracer was filled in and the area re-surveyed to establish as-built <br /> elevations. <br /> The Repairs Report includes a certification that all repairs to the damaged area of Module 5 were <br /> conducted in accordance with the 26 October 2015 approved work plan and approved project <br /> specifications and CQA. The report also certifies that the LCRS for the module is functioning as <br /> designed. Based on these certifications and a review of the report, Water Board staff hereby <br /> acknowledges that the repairs to the damaged area of Module 5 have been completed. <br /> We also received the final as-built report for Module 5, Phase 1, the review of which has been on <br /> hold pending approval of the Repairs Report. We will be providing our response to the final as- <br /> built report in a separate letter. <br /> If you have any questions, please contact me by telephone at (916) 464-4641 or by email at <br /> john.moody@waterboards.ca.gov. <br /> John Moody, P.E. <br /> Water Resource Control Engineer <br /> Title 27 Permitting and Mines <br /> Enclosures <br /> 1. Module 5 Interim Approval Letter <br /> 2. Module 5 Repair Area Drawing <br /> cc: Christine Karl, Permitting & LEA Support, CalRecycle, Sacramento <br /> Robert McClellon, San Joaquin County Environmental Health Department, <br /> Stockton <br /> Michael Raub, Advanced Earth Sciences, Inc., Irvine <br />
The URL can be used to link to this page
Your browser does not support the video tag.