Laserfiche WebLink
--- - -. ------ -- --- - - . <br /> - <br /> Cs&I <br /> GROUNDWATER SAMPLING AND ANALS� T FORM <br /> 0 <br /> PROJECT NAME: North .n-0 Landfill <br /> Sanoaqum ou ty <br /> DATE SCHEDULED: pril 2014 <br /> SPECIAL INSTRUCTIONS/CONSIDERATIONS: uthorizati©n: X Isham <br /> First Semester(2nd Quarter 2014) cord Dir: 925-288-2381 <br /> /� rf <br /> Cell: 925-457-1130 <br /> J <br /> Pro ect 'o.: 149270.0001 <br /> R <br /> JF 1 r' Coord* tor: Sheila Richgels <br /> Field: Paul Weinhardt <br /> 1 <br /> 530-391-4037 <br /> Well Lock <br /> X Number(s) <br /> 0464 <br /> Notify Mike Carroll prior to monit ring event. NCI(site) <br /> Phone(209)468-8504 Or via E-mai <mcarroll@sjgov.org> 2246(site) <br /> For road access to G-6,contact Marc Davenport @209-887-3838. H-1 <br /> Site Contact: Marcus Davenport at scaleho : 209-887-3868 <br /> Well Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTED <br /> (inches) (feet) (feet) <br /> Last Event: 1/28/2014 <br /> Water Levels/Elevations in all wells <br /> G-1 3.0 176.5 170.17 <br /> G-2A 2.0 169.0 158.48 <br /> G-3D 4.0 170.0 16238 <br /> G4 4.0 172.1 165.78 <br /> G-5A 2.0 171.0 159.34 <br /> G-6 2.0 164.5 161.58 <br /> G-2 4.5 153.1 Dry. <br /> G-5 4.0 156.0 Dry. <br /> Laboratory and Lab QC Instructions <br /> N.Cnty 2nd&4th Q Page 1 of 1 <br />