My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1988_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1988_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:52:44 PM
Creation date
7/3/2020 11:04:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1988_2
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1988_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br />will be flushed for 24 hours by sampling a source of air which has had <br />the organics removed by passage through a carbon filter. <br />±15 minutes of each other over a 24-hour period, the timer <br />settings will be adjusted and rechecked. <br />• Leak check - The sampler will be checked for loose fittings <br />and leaks. <br />Ambient air samples will be collected over a 24-hour period. Each sam- <br />ple will be obtained at a height of 9 feet above the ground and col- <br />lected in the prescribed 10 -liter Tedlar bag. The samples will be <br />removed from the samplers immediately after the 24-hour period and ana- <br />lyzed within 72 hours. Sampling instructions are as follows. <br />Begin sampling with the following steps. <br />• Open the shutoff valve at the probe inlet. <br />• Before attaching the sample bag to the sampler, activate <br />the sampler pump; allow sufficient time for warm-up. <br />• Set the widest spherical point of the flow meter's black <br />glass ball at 24.3 by adjusting the pressure valve. This <br />setting will maintain a flow rate of 0.006 liter/minute <br />according to the flow rate curve. <br />• Turn off the sampler pump. <br />• Attach the bag inlet to the sampler outlet. Be sure that <br />the bag valve is in the open position (valve stem pushed in <br />and lock screw tightened). <br />• Record the sample start information as required on the data <br />sheet. <br />PJI 9390301 13 <br />0 <br />• Flow meter - The flow meter will <br />be kept at a constant flow <br />rate through a 24-hour sampling <br />period by the <br />use of a <br />pressure adjustment valve. The <br />flow rate will <br />be checked <br />and documented daily during use. <br />• Timer - Two timers will be used <br />at the site. <br />The timers <br />will be checked against each other. <br />If they are <br />not within <br />±15 minutes of each other over a 24-hour period, the timer <br />settings will be adjusted and rechecked. <br />• Leak check - The sampler will be checked for loose fittings <br />and leaks. <br />Ambient air samples will be collected over a 24-hour period. Each sam- <br />ple will be obtained at a height of 9 feet above the ground and col- <br />lected in the prescribed 10 -liter Tedlar bag. The samples will be <br />removed from the samplers immediately after the 24-hour period and ana- <br />lyzed within 72 hours. Sampling instructions are as follows. <br />Begin sampling with the following steps. <br />• Open the shutoff valve at the probe inlet. <br />• Before attaching the sample bag to the sampler, activate <br />the sampler pump; allow sufficient time for warm-up. <br />• Set the widest spherical point of the flow meter's black <br />glass ball at 24.3 by adjusting the pressure valve. This <br />setting will maintain a flow rate of 0.006 liter/minute <br />according to the flow rate curve. <br />• Turn off the sampler pump. <br />• Attach the bag inlet to the sampler outlet. Be sure that <br />the bag valve is in the open position (valve stem pushed in <br />and lock screw tightened). <br />• Record the sample start information as required on the data <br />sheet. <br />PJI 9390301 13 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.