Laserfiche WebLink
c) <br />Summary of finding,s <br />1. <br />Development Plan <br />d) <br />Equipment <br />e) <br />Engineering firm providing the service <br />5. Field Permeability and Water Plan Data <br />or proposed prototypical operations scenario drawing). <br />a) <br />Procedure (e.g., single packer test, pump recovery tests). <br />Profiles and sections, detailed cross section drawings of <br />b) <br />Plates and charts of packer and pump test permeability. <br />typical completed waste cells, liners, drains, ditches, <br />Site flow for flow, <br />channels, silt traps, curtain walls, leachate and gas monitor- <br />c) <br />water rates groundwater spring perched <br />ing well (typical) collection systems, roads, berms, typical <br />water seeping from soil overburden, stream flow. <br />cross section of current landfilling operation, surface slopes, <br />6. Surface drainage and water balance calculations. <br />XI. <br />DESIGN DRAWINGS AND CALCULATIONS: <br />1. <br />Development Plan <br />Z. <br />Preparation and excavation plan (to be tied into the existing <br />or proposed prototypical operations scenario drawing). <br />3. <br />Profiles and sections, detailed cross section drawings of <br />typical completed waste cells, liners, drains, ditches, <br />channels, silt traps, curtain walls, leachate and gas monitor- <br />ing well (typical) collection systems, roads, berms, typical <br />cross section of current landfilling operation, surface slopes, <br />and depth of soil cover. <br />4. <br />Construction details <br />*X11. SITE SURFACE DRAINAGE <br />1. <br />One hundred year site flood protection, and site water <br />balance calculations. <br />10 <br />