Laserfiche WebLink
M. OPERATIONS PLAN <br /> 4600 <br /> A. FACHM DESIGN <br /> 1. DESIGN PLANS <br /> Preliminary Development Plans for the Tracy Materials Recovery &Transfer Facility have been <br /> prepared and are included in Section 3 of this Report of Facility Information. Table 4 identifies <br /> the sheet number and description of each sheet of the Preliminary Development Plans. <br /> Tibto 4 <br /> Prehmmwy Deagn Plans <br /> Sheet s Plan Nam Description <br /> 1 Cover Sheet Title, Vicinity Map,Sheet Index, General Notes <br /> 2 Preliminary Site Plan Layout and general dimensions of the site including buildings, access <br /> roads and parking and compost and wood storage areas. <br /> 3 Preliminary Grading& Site plan showing surface runoff and site drainage patterns and <br /> Drainage Plan control features. <br /> ® 4 Preliminary Utility Plan Site plan showing water and sewer locations. <br /> 5 Preliminary Landscape Site plan showing the type and location of landscape vegetation. <br /> Plan <br /> 6 MRF/Transfer Station Floor plan showing tipping, processing, storage and transfer areas. <br /> Preliminary Floor Plan <br /> 7 Office/Maintenance Floor pian showing maintenance shop, paint booth, storage area and <br /> Building Preliminary administrative offices. <br /> Floor Plan <br /> 8 MRF/Transfer Station North, South, East, West elevation views of the MRF/Transfer <br /> Preliminary Elevations building. <br /> 9 Office/Maintenance North, South, East, West elevation views of the Office/Maintenance <br /> Building Preliminary building. <br /> Elevations <br /> 10 MRF Section MRF sorting line cross section <br /> L:/PR07ECr/397/NW/RSI-1.TCY <br /> Revision 1.0 19 December 15, 1993 <br />