My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 11:04:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Waste Loading (Open Top): Number of available loading bays = 2, at 15 min. loading <br /> time per trailer the hourly loading = 2 bays x 4 per hr. x <br /> 20 tons = 160 tph. <br /> mum Loading hours = 400 tpd / 160 tph =-ZLbn <br /> Material Sorting: Number of lines = I with 12 sorters, hourly sorting rate <br /> for curbside material = 0.5 tph per sorter x 12 sorters = <br /> 6 tph, hourly sorting rate for other sorted material = 0.75 <br /> tph per sorter x 12 sorters = 9 tph. <br /> Minimum total sorting hours = (40 tpd / 6 tph) + (50 tpd <br /> / 9 tph) =12.2 bra, pgr day, <br /> Material Loading: Assume 20 ton truck loading at I per hour with 2 bays <br /> 40 tph. <br /> Minimum loading hours = 230 tpd 40 tph a bra, ner <br /> du. <br /> Baling: Average 20 tph per baler x I baler = 20 tph. <br /> Minimum baling hours = 140 tpd 20 tph =-LhLj,= <br /> daL assuming all recycled material is baled. <br /> Conclusion <br /> 1. Tipping floor has a capacity for 2.9 days of waste storage. <br /> 2. All waste transfer and material sorting and processing can be accomplished within the <br /> proposed facility operating hours for 800 tpd of incoming material. <br /> I-VROJECrOrAMRF%'LOWC".DS Dwm*w 15,IM <br /> F-3 EM WASrBCHMLWIU <br />
The URL can be used to link to this page
Your browser does not support the video tag.