My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:24:32 AM
Creation date
7/3/2020 11:04:31 AM
Metadata
Fields
Template:
EHD - Public
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOUNDATION LAYER <br /> The foundation layer is the first layer of the final landfill <br /> cover. It consists of on-site soils compacted to a minimum of 90% <br /> relative maximum dry density. Compaction was achieved by County <br /> forces using a Caterpillar model 825C sheepsfoot compactor. <br /> Kleinfelder performed all moisture-density testing for the <br /> foundation layer. Please refer to the Kleinfelder Final CQA Report <br /> included as Appendix A for foundation layer moisture-density test <br /> data. The foundation layer is a minimum of two feet thick. The <br /> foundation layer sets the slope grades for the clay barrier layer <br /> and vegetative layer. Grades for the foundation layer were <br /> verified by a topographic survey performed by A. R. Sanguinetti and <br /> Associates for the County (Drawing 1) . <br /> CLAY BARRIER LAYER <br /> The clay barrier layer is the second layer of the final cover, and <br /> directly overlies the foundation layer. The clay barrier layer <br /> consists of select soil from Granite Construction Company's quarry <br /> mixed with red clay from the same quarry. The clay barrier layer <br /> has a minimum thickness of one foot. <br /> The clay barrier layer portion of the final cover construction is <br /> certified by Kleinfelder, Inc. in their Final CQA Report referenced <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.