Laserfiche WebLink
File No. 20-1008-36 KLEINFELDER <br /> July 14, 1995 <br /> Page 3 of 3 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subsrade(ft.) % Dry Wt. P.C.P. Curve No. Compaction Compaction <br /> TEST PAD #5 <br /> 44 04-20 10' S. & 10' E. of SW corner FSG 11.3 116 5 90 90 <br /> 45 04-20 6' S. & 65' E. of SW corner FSG 11.3 116 5 90 90 <br /> 46 04-20 2' S. & 60' E. of SW corner FSG 9.8 122 5 95 90 <br /> 47 04-20 5' S. & 50' E. of SW corner FSG 12.3 117 5 91 90 <br /> 48 04-20 6' S. & 20' E. of SW corner FSG 12.0 120 5 94 90 <br /> TEST PAD #4 <br /> 49 04-21 60' E. & 10' S. of NW corner FSG 9.9 114 4 91 90 <br /> 50 04-21 50' E. & 5' S. of NW corner FSG 9.3 114 4 92 90 <br /> 51 04-21 20' E. & 12' S. of NW corner FSG 10.1 118 4 95 90 <br /> 52 04-21 14' E. & 9' S. of NW corner FSG 10.0 112 4 90 90 <br /> 04-21 5' E. & 10' S. of NW corner FSG 9.9 113 4 91 90 <br /> TEST PAD #2 <br /> 54 04-21 15' N. & 130' E. of SW corner FSG 10.0 112 3 90 90 <br /> 55 04-21 10' N. & 50' E. of SW corner FSG 11.7 112 3 90 90 <br /> 56 04-21 130' N. & 12' E. of SW corner FSG 10.5 113 3 91 90 <br /> 57 04-21 120' N. & 15' E. of SW comer FSG 12.2 112 3 90 90 <br /> 58 04-21 55' N. & 20' E. of SW corner FSG 9.8 114 3 92 90 <br /> TEST PAD 1 <br /> SC-1 04-21 12' E. & 35' N. of SW corner FSG 11.7 121 2 95 95 <br /> TEST PAD 2 <br /> SC-2 04-21 130' N. & 10' E. of SW corner FSG 11.2 112 3 90 90 <br /> TEST PAD 3 <br /> SC-3 04-21 130' N. & 15' E. of SW corner FSG 13.1 111 4 92 90 <br /> TEST PAD 4 <br /> SC-4 04-21 15' E. & 10' N. of SW corner FSG 11.0 114 3 91 90-92 <br /> TEST PAD 5 <br /> 5 04-21 125' E. & 8' S. of NW corner FSG 10.6 117 5 90 90 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1995 Kleinfelder,Inc. <br />