Laserfiche WebLink
EXEND CLOSURE CAP WITH GCL <br /> ADDITIONAL SOIL <br /> COMPACTED TO 90% RC <br /> EXISTING LANDFILL SURFACE CLASS I AGGREGATE BASE <br /> SMOTH DRUM ROLLED <br /> NEW DITCH ALIGNMENT W/ <br /> ANTI—EROSION MESH REMOVE EXISTING ROAD <br /> OVERLAP SURFACE <br /> FENCE <br /> n y� •. <br /> . h • 4 <br /> a <br /> v + ! <br /> EXISTING CLAY BARRIER AS VERIFIED <br /> BY POT—HOLING REFUSE EXISTING HIGH—PRESSURE <br /> PETROLEUM PIPELINE <br /> GCL <br /> DRAINAGE DITCH WITH MINIMAL <br /> COVER OVER REFUSE <br /> NATIVE SOIL <br /> Investigate 06 Figs.dwg <br /> COUNTY OF SAN JOAQUIN AS s E: SAN RAL LANDFILL CLOSURE CAP EXTENSION FIGURE 6 <br />