Laserfiche WebLink
CLOSURE CAP EXTENSION PROJECT <br /> CORRAL HOLLOW SANITARY LANDFILL <br /> Joint Technical Document Index <br /> (Continued) <br /> CIWMB JTD Requirements (cont.) CIWMB Section No. SWRCB Section No. Information location <br /> CIWMB—Closure/Postclosure Maintenance Plan <br /> Requirements FINAL Closure Plans <br /> Items Under 21790(Preliminary Plans) 21800(c) 20425(d)(3), 20950(f) <br /> 20909(a)-(a)(3) (A)(3),21090 CPA&PCMPA <br /> Sequence of Closure Stages With Dates 21800(c) 21090(a)-(a)(2), (d) CPA Page 5, Section 4.0 <br /> Schedule for Disbursement 21800(d) CPA Page 12, Section 6.0 <br /> CIWMB-Closure/Postclosure Maintenance Plan Requirement: Postclosure Maintenance Plans <br /> Description of Planned Uses 21825(b)(1) 21769(b) PCMPA Page 4, Section 4.0 <br /> Description of Maintenance 21825(b)(2) 21769(b) PCMPA Page 4, Section 5.0 <br /> Emergency Response Plans 21830(b)(1) 21769(c ) PCMPA Page 6, Section 6.0.,PCMP Appendix B <br /> List of Responsible Parties 21830(b)(2) 21769( c) PCMPA Page 2, Section 1.0 <br /> Post-Closure Planned Uses 21830(b)(3) 21769(c ) PCMPA Page 4, Section 4.0 <br /> As-builts for Monitoring and Control Systems,etc. 21830(b)(4) 21769(c) CP Appendix D <br /> Description of Maintenance 21830(b)(5) 21769(c) PCMP Page 6, Section 5.0 <br /> PCMPA Pa e 4, Section 5.0, <br /> Operations and Maintenance plan for Gas Control OO 21830 b 6 21769 <br /> System (c) PCMPA: Appendix G <br /> Plan to Report Results of Monit./Control 21830(b)(7) 21769(c) PCMP Page 5, Section 3.0 <br /> PCMPA Page 3, Section 3.0 <br /> Postclosure Mtce. Cost Estimates 21830(b)(8) 21769(c ) PCMPA Table 1 <br /> N:\lCorr2l Hollow\CH Closure&PCMP E-Docs\Final Closure Plan Addendum_Revsied Oct 2011\CH-Joint Technical Document Index doc <br /> Closure Cap Extension Project San Joaquin County <br /> Corral Hollow Sanitary Landfill 2 Department of Public Works <br /> October 6,2011 Solid Waste Division <br />