My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 9:18:01 PM
Creation date
7/3/2020 11:04:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance(CQA) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21, 2008 <br /> '.0 INTRODUCTION <br /> '.' Purpose <br /> The purpose of this Plan is to describe the construction quality assurance (CQA) <br /> procedures to be used by the CQA organization during the closure cap extension project <br /> at the Corral Hollow Sanitary Landfill. <br /> The CQA Plan is a guidance document that contains general and specific work element <br /> requirements for monitoring construction. General requirements include the <br /> organization and responsibilities of CQA personnel, documentation control, and <br /> reporting procedures. Specific work elements include the following: <br /> ♦ Clearing and Stripping <br /> ♦ Engineered Fill <br /> ♦ Liner Subgrade Preparation <br /> ♦ Vegetative Cover <br /> AML ♦ Geosynthetic Clay Liner (GCL) <br /> The CQA organization will prepare a Final Construction Report(FCR) upon completion <br /> of construction. The FCR will include information generated through out the CQA <br /> program and will document the extent to which construction was performed in <br /> accordance with the contract documents and design. The CQA organization will be <br /> required to submit the FCR within one month of substantial completion of <br /> construction. <br /> 1.2 CQA Organization <br /> The CQA organization has the primary responsibility of implementing and managing <br /> the CQA program described in this Plan and will document to the appropriate <br /> regulatory agencies that construction of the facility was performed in compliance with <br /> the design and the contract documents. Specific responsibilities for the CQA <br /> organization site personnel are presented in Section 2.2, Responsibilities of <br /> Vector Engineering, Inc. •143E Spring Hill Drive *Grass Valley, CA • (530) 272-2448 <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.