My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 9:18:01 PM
Creation date
7/3/2020 11:04:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance(CQA) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21, 2008 <br /> 2.1.2 Progress Meetings <br /> Informal progress meetings will be held each morning before the start of work. At a <br /> minimum, this meeting will be attended by the construction manager (if necessary), <br /> CQA Monitor, and Contractor. The purpose of this meeting is to: <br /> ♦ Discuss problems and resolutions. <br /> ♦ Review test data. <br /> ♦ Discuss the Contractor's personnel and equipment assignments for the <br /> day. <br /> ♦ Review the previous day's activities and accomplishments. <br /> ♦ Resolve any outstanding problems or disputes. <br /> 2.1.3 Weekly Meetings <br /> Weekly scheduled meetings will be held. The project manager, construction manager, <br /> CQA Officer (if required), CQA Monitor, and Contractor will be present. The meetings <br /> will be held to discuss progress, problems, construction schedule, changes, test data, <br /> safety, environmental issues, and any other issues necessary. The CQA Monitor or <br /> CQA Officer will prepare the agenda for each meeting and prepare meeting minutes for <br /> distribution to all parties. <br /> 2.1.4 Other Meetings <br /> As required, special meetings will be held to plan work items and to discuss problems <br /> or non-conformance. These meetings will be attended by parties as directed by the <br /> owner. If the problem requires a design modification and subsequent change order, the <br /> engineering project. managers will also be present. The meeting will be documented as <br /> directed by the project manager. <br /> Vector Engineering, Inc. •143E Spring Hill Drive *Grass Valley, CA• (530) 272-2448 <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.