My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 9:18:01 PM
Creation date
7/3/2020 11:04:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance(CQA) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> more copies of the most current set of contract documents for use by the CQA <br /> organization. Upon issuance of new copies or revisions, it is the responsibility of the <br /> construction manager to notify the Contractor of the revisions, provide revised contract <br /> documents, and order the recall of all non-revised copies of the contract. documents. <br /> 2.3.2 Project Control of As-Built Information <br /> As-built information generated by the Contractor and CQA organization is controlled <br /> by the CQA Manager. During the progress of the work, the CQA Manager obtains as- <br /> built information provided from the CQA Monitors, Contractor, surveyors, or others. <br /> At the completion of the project, this information is presented with the FCR. The as- <br /> built drawings set must be maintained on-site and be clearly marked as Record <br /> Drawings. <br /> 2.3.3 Project Control of Forms <br /> Adlbk Daily report forms, test report forms, and other project forms are controlled by the CQA <br /> Manager who maintains a master of each form for copies. Upon issuance of a new <br /> form, the CQA Manager must recall and remove all superseded copies along with the <br /> master, notify the CQA Monitors, and provide new copies for their use. <br /> 2.3.4 Processing Daily Reports <br /> The CQA Monitors write a daily record of work progress. The daily reports are <br /> reviewed by the CQA Manager for legibility, clarity, traceability, and completeness. <br /> The review must be evidenced by signature. Daily reports are submitted to the <br /> construction manager on a daily basis and are maintained at the site. A weekly <br /> summary construction report will be prepared by the CQA manager and submitted to <br /> the construction manager. <br /> Vector Engineering, Inc. •143E Spring Hill Drive -Grass Valley, CA• (530) 272-2448 <br /> -10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.