My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 9:18:01 PM
Creation date
7/3/2020 11:04:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance(CQA) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21, 2008 <br /> 2.5 Construction Monitoring <br /> 2.5.1 Monitoring Priorities <br /> Before commencement of construction, the CQA Manager will establish a list of <br /> monitoring priorities. The list shall include the various construction activities and the <br /> monitoring priority of those activities. The monitoring priorities may change during <br /> construction, based upon Contractor performance and owner request. Changes in the <br /> monitoring priorities must be approved by the CQA Manager, <br /> 2.5.2 Discrepancies <br /> All CQA testing must be conducted in accordance with this CQA Plan, the document <br /> that requires the most. frequent tests or has more stringent test requirements will <br /> govern, unless otherwise specified by the CQA Manager. <br /> 2.6 Materials Quality Verification <br /> 2.6.1 General <br /> Material sources will be identified and samples tested to determine if the material <br /> meets project specifications for specific work elements. Definitions and requirements of <br /> materials are provided in the technical specifications. Test samples will be obtained in <br /> accordance with applicable ASTM and/or industry standards. Archive samples and <br /> test results of the test samples will be maintained and stored at the project. site. The <br /> CQA Monitors will establish and maintain a materials quality verification list. The <br /> list will include material sources, sample locations, testing requirements, test results, <br /> and verification action items. <br /> 2.6.2 Material Submittals <br /> Material submittals may be used by the CQA organization to establish the <br /> acceptability of materials. When sample submittals are required, they will be made <br /> available to the CQA organization by the Contractor. Acceptance and proper review of <br /> submittals are the responsibility of the CQA Manager. <br /> Vector Engineering, Inc. •143E Spring Hill Drive -Grass Valley, CA • (530) 272-2448 <br /> -13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.