Laserfiche WebLink
Vadose zone monitoringcosts reflect actual charges to the Count tooperate and <br /> g Y <br /> maintain this system (Table 1). <br /> 6.0 FINAL COVER MAINTENANCE <br /> Initial costs escalated to 2011 dollars by CalRecycle inflation factors (Table 1). Final <br /> cover maintenance for the closure cap extension area is an estimated average annual <br /> value. <br /> 7.0 DRAINAGE SYSTEM MAINTENANCE <br /> Per section 5.2, the existing drainage patterns of CHSL will not be significantly changed <br /> by the closure cap extension project. The drainage system maintenance cost of the <br /> closure cap extension project is not included as an additional cost, but considered part of <br /> the initial drainage maintenance cost of CHSL. The Initial costs to maintain drainage <br /> system of the Landfill has been escalated to 2011 dollars by CalRecycle inflation factors <br /> (Table 1). <br /> 8.0 INSPECTIONS <br /> Initial inspection costs have been escalated from the original estimate to 2011 dollars by <br /> CalRecycle inflation factors (Table 1). Inspection cost for the closure cap extension <br /> project is based on the 12% proportional increase of the closure cap area. <br /> 9.0 TOPOGRAPHIC MONITORING <br /> Initial costs escalated to 2011 dollars by CalRecycle inflation factors (Table 1). <br /> 10.0 POSTCLOSURE COST SUMMARY <br /> The annual cost to maintain the Corral Hollow Landfill will be approximately $88,000 <br /> (2011 dollars) (Table 1). <br /> Postclosure Maintenance Plan Addendum San Joaquin County <br /> Corral Hollow Sanitary Landfill 8 Department of Public Works <br /> Revised October 6,2011 Solid Waste Division <br />