Laserfiche WebLink
C <br />B. Prohibition against the use of solvents: Solvents and solvent cements shall not be <br />used in the assembly or installation of the piping and appurtenances for the soil gas <br />collection system. <br />PART 4 - MEASUREMENT AND PAYMENT <br />4.01 MEASUREMENT <br />A. Payment for furnishing and installing HDPE Piping will be by unit price per linear <br />foot quoted in the Bid Schedule. <br />4.02 PAYMENT <br />A. The unit price quoted for HDPE Piping shall include full compensation for furnishing <br />all labor, materials, equipment, tools, accessories, surveying, incidentals, and for <br />performing all work necessary including, but not limited to, handling, overlap, HDPE <br />couplings, fittings, end caps, welding, trenching, backfill, installation of materials, <br />and all submittals required to complete the work consistent with these specifications <br />and Construction Drawings. <br />END OF SECTION 02750 <br />n <br />D <br />D <br />n <br />1 SHAW ENV/RONMENTAL, /Nc. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj_Technical Specs -4-19-12 Revl.DocRev. 0, 09/28/2011 <br />1 High Density Polyethylene (HDPE) Piping <br />02750-5 <br />