My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:38 PM
Creation date
7/3/2020 11:05:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />C <br />7 <br />0 <br />C <br />CI <br />r <br />ri <br />Fill <br />L <br />4. Written instructions for storage, handling installation, seaming and repair of <br />proposed geocomposite: <br />B. Submit the following 7 days prior to scheduled installation to the Engineer. <br />C. Manufacturer's certificates of compliance stating geocomposites comply with <br />specified requirements. <br />D. MQC test results performed on materials manufactured for this project. <br />1.07 SLOPE STABILITY VERIFICATION (PERFORMED BY ENGINEER) <br />Prior to manufacturing geocomposite products for this project, Engineer will perform and review <br />one interface shear test for the geocomposite and geomembrane interface. Direct shear tests will <br />be performed on the sample provided with "submittals", in accordance with the testing <br />procedures outlined in the CQA Plan. Provide the roll and lot number from which the <br />geocomposite samples is taken, along with the MQC test data from that lot. The material <br />properties of the sample provided for direct shear testing will be used as a basis for accepting the <br />material provided for the project. <br />1.08 CONFORMANCE TESTING (PERFORMED BY ENGINEER) <br />A. Engineer will perform conformance testing on geocomposites as outlined in the <br />CQA manual. <br />B. Schedule 7 calendar days prior to installation for conformance tests to be performed <br />and data to be reviewed. <br />1.09 DELIVERY, STORAGE, AND HANDLING <br />A. Ship geocomposite in closed trailer. <br />B. Label, deliver and store in accordance with ASTM D4873. <br />C. Mark roll numbers, manufacturer's name, product identification, lot number and roll <br />dimensions on protective covering. <br />D. Maintain integrity of protective wrapping during shipment and storage. <br />E. Elevate off ground during shipment and storage and protect them from the <br />following: <br />F. Site construction, precipitation, extended ultraviolet radiation including sunlight, <br />chemicals that are strong acids or strong bases, flames including welding sparks, <br />temperatures in excess of 160°F (71'C), any other environmental condition that may <br />damage the property values of the geotextile. <br />SHAW ENVIRONMENTAL, /NC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj Technical Specs -4-1942 Revl.DocRev. 0, 09/28/2011 <br />Geocomposite Drainage Layer <br />02773-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.