My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:38 PM
Creation date
7/3/2020 11:05:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Prior to shipment, submit the following data for geomembrane rolls manufactured <br />for this project: <br />1. Statement of production date or dates. <br />2. MQC test results documenting that geomembrane manufactured for this project <br />meets product specifications as defined in Part 2 of this section. Perform MQC <br />tests at the frequencies listed in Part 2 of this Section. <br />3. Sample manufacturer's warranty. <br />1.09 QUALIFICATION SUBMITTALS FOR REVIEW (INSTALLER) <br />A. Submit the following two weeks prior to installation: <br />1. Name of company that will install geomembrane <br />2. Resume of installation supervisor/field engineer that will be assigned to the <br />project. <br />3. Resumes of personnel that will perform seaming operations. <br />A. Installation layout drawings: Two weeks prior to installation of geomembrane, <br />submit shop drawings showing the panel layout indicating both fabricated (if <br />applicable) and field seams, and details not conforming to the Construction <br />Drawings. Upon acceptance, use these drawings for installation of geomembrane. <br />1.11 INSTALLATION SUBMITTALS (INSTALLER) <br />A. Submit quality control documentation prepared during installation, including copies <br />of seam test results. <br />B. On a daily basis and prior to installation, submit subgrade acceptance certificate <br />signed by the installation supervisor for each area to be covered by the <br />geomembrane. <br />C. Upon completing entire installation submit manufacturer/fabricator and installation <br />warranties. <br />D. Upon completing entire installation submit as -built drawings showing location of <br />panels, seams, repairs, patches, and destructive samples. <br />SHAW ENV/RONMENTAL, INC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH Closure Cap Ext Proj Technical Specs -4-19-12 Revl.DocRev. 0, 04/05/2012 <br />LLDPE Geomembrane <br />02779-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.