My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:38 PM
Creation date
7/3/2020 11:05:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />I <br />n <br />fl <br />0 <br />0 <br />i <br />C <br />n <br />0 <br />0 <br />I I <br />C <br />C <br />n <br />11 <br />U <br />u <br />B. Purge welding apparatus of heat -degraded extrudate before welding. <br />C. Bevel top edges of geomembrane a minimum of 45° and full thickness of <br />geomembrane before extrusion welding. <br />D. Clean seam -welding surfaces of oxidation by disc grinder or equivalent not more <br />than 30 minutes before extrusion welding. Change grinding discs frequently. Do not <br />use clogged discs. <br />E. Do not remove more than 4 mils of material when grinding. <br />F. Grind across, not parallel to, welds. <br />G. Cover entire width of grind area with extrudate. <br />H. When restarting welding, grind ends of all welds that are more than five minutes <br />old. <br />3.10 HOT WEDGE WELDING <br />A. Do not weld on geomembrane until equipment has passed trial weld test. <br />B. Place smooth insulating plate or fabric beneath hot welding apparatus after usage. <br />C. Protect against moisture build-up between panels. <br />D. If welding cross seams, conduct trial welds at least every two hours, otherwise, once <br />prior to start of work and once at mid-day. <br />E. Bevel edges of top and bottom panels on cross seams. <br />F. Extrusion -weld a repair patch over all tee and cross -seam intersections. <br />3.11 INSTALLATION QUALITY CONTROL <br />A. Log the following every four hours: <br />1. Temperature on the geomembrane surface being welded. <br />3. Extrudate temperatures in barrel and at nozzle (extrusion welder). <br />4. Operating temperature of hot wedge (hot wedge welder) and any pressure <br />adjustments made. <br />5. Preheat temperature. <br />SHAW ENVIRONMENTAL, INC. <br />San Joaquin County — Extension of Cap Corral Hollow Sanitary Landfill — CH—Closure Cap Ext Proj jcchnical Specs -4-19-12 Rev 1.DocROv. 0, 04/05/2012 <br />LLDPE Geomembrane <br />02779-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.