My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:32:56 AM
Creation date
7/3/2020 11:05:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2.4 Geomembrane Subgrade Preparation <br /> Prior to geomembrane deployment, the surface on which the geomembrane will be installed must <br /> be prepared in accordance with the technical specifications. Before geomembrane installation, <br /> the CQA monitor and geosynthetics installer must inspect the surface. The CQA monitor must <br /> verify the following: <br /> ® The soil underlying geomembrane has been prepared in accordance with the final cover <br /> subgrade preparation technical specifications. <br /> ® No sharp objects or other materials that could puncture the geomembrane are present on <br /> the prepare subgrade soil surface. <br /> ® The anchor trench dimensions have been checked, and the trenches are free of sharp <br /> objects and stones. <br /> ® There are no excessively soft areas. <br /> ® All construction stakes have been removed. <br /> ® The geosynthetics installer has certified in writing on a form acceptable to the CQA <br /> monitor that the surface on which the geomembrane will be installed is acceptable. <br /> 5.2.5 Panel Layout As-Built <br /> During installation, the CQA monitor will maintain an as-built panel layout drawing that shows <br /> the following as-built information: <br /> ® Orientation and size of each geomembrane panel. <br /> ® Roll numbers associated with each panel. <br /> ® Assigned panel numbers. <br /> ® Assigned seam numbers. <br /> ® Destructive test locations. <br /> ' ® Repair locations. <br /> 5.2.6 Panel Placement Documentation <br /> During panel placement operations,the CQA monitor must: <br /> ® Record panel numbers and dimensions on a panel/seam log. <br /> ® Observe the panel surface as it is deployed and record all panel defects and defect <br /> corrective actions (panel rejected, patch installed, extrudate placed over the defect, etc.) on <br /> ' a repair sheet. <br /> ® Verify where required, corrective actions are made in accordance with the technical <br /> specifications. <br /> ® Verify equipment used during deployment operations does not damage the geomembrane. <br /> CH CQA Plan 041712 Rev2a.doc 5.5 Construction Quality Assurance Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.