My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2012_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2012_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:32:56 AM
Creation date
7/3/2020 11:05:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2012_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iResults of peel and shear tests must be recorded on a trial weld form. Trial welds must be <br /> completed under conditions similar to those under which production seams will be welded. Trial <br /> welds must meet specified requirements for peel and shear and the failure must be ductile or a <br /> film tearing bond (FTB) for a wedge weld. An FTB means the test specimen breaks at the edge <br /> of the outside of the seam, but not in the seam. <br /> If at any time the CQA monitor believes that a welding apparatus is not functioning properly, a <br /> trail weld must be performed. If there are wide changes in temperature (130°F.), humidity, or <br /> wind speed, another trail weld must be performed. The trail weld must be allowed to cool to <br /> ambient temperature before it is tested. <br /> 5.2.8 Production Welds <br /> During geomembrane welding operations,the CQA monitor must: <br /> e Verify the installer has the number of welding apparatuses and spare parts necessary to <br /> continuously perform the work. <br /> e Verify equipment used for welding will not damage the geomembrane. <br /> e Verify extrusion welders are purged before beginning a weld so that all heat-degraded <br /> extrudate is removed from the nozzle of the welder. <br /> a Verify seam grinding is completed less than one (1)hour before seam welding, and the <br /> upper sheet is beveled(extrusion welding only). <br /> e Verify ambient temperature is measured six (6)inches above the geomembrane surface is <br /> between 40 Degrees Fahrenheit(°F) and 104°F. <br /> e Verify ends of extrusion welds that are more than 5 minutes old, are ground to expose new <br /> material before restarting a weld. <br /> e Verify contact surfaces of the panels are clean and free of dust, grease, dirt, debris, and <br /> moisture before welding. <br /> e Verify welds are free of dust,rocks,and other debris. <br /> a Verify cross seams are ground to a smooth incline before welding(fusion welding only). <br /> e Verify all seams are overlapped a minimum of 3 inches or in accordance with <br /> manufacturer's recommendations,whichever is more stringent. <br /> e Verify solvents or adhesives are not present in the seam area. <br /> e Verify procedures used to temporarily hold the panels together do not damage the panels <br /> and do not preclude CQA testing. <br /> a Verify panels are being welded in accordance with the plans and technical specifications. <br /> CH CQA Plan 041712 Rev2a.doc 5-7 Constriction QuaW ksurance Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.