Laserfiche WebLink
Photo 14—Vegetative Cover <br /> Photo 15 —Drainage Ditch <br /> Photo 16—Completed Road with Ditch and Fence <br /> Photo 17—Drilling Soil Gas Wells <br /> Photo 18 —Installing Soil Gas Wells <br /> Photo 19—Finished Soil Gas Wells <br /> APPENDIX <br /> ' Construction Drawing Excerpts <br /> Summary of Large Scale Shear Strength Tests: <br /> Pre-Construction Qualification <br /> Confirmation of Construction Materials <br /> Typical Results— Destructive Seam Weld <br /> Perimeter Landfill Gas Migration Monitoring Well Logs <br /> Brief Technical Certification Report Department of Public Works/Solid Waste <br /> Corral Hollow Closure Cap Extension II County of San Joaquin—September 6,2013 <br />