0 <br />On May 31, 2012, the County submitted a Final Cover Expansion Design incorporating review <br />comments received by RWQCB staff. Reconsideration of the schedule by Shaw Environmental <br />indicated project completion in March 2013. <br />On June 6, 2012, the County submitted a revised schedule showing bidding in late 2012 with <br />construction starting in the spring of 2013. A letter from Water Board staff dated July 13, 2012 <br />apparently tentatively accepted that revised schedule. <br />' On August 21, 2012, the County submitted the Evaluation Monitoring Program Report — Phase 2, <br />which delineated the extent of groundwater impact. <br />On September 26, 2012, the County received a Notice of Violation for failure to delineate the <br />extent of groundwater impact, and requiring the following: <br />• Install a fourth permanent groundwater monitoring well beyond Investigate the extent of <br />the VOC plume to the north-northeast of the site <br />• Conduct a water supply well search within a 1 -mile radius of the site (not previously <br />required) <br />• Install a minimum of two soil gas probes along the northern site boundary (not previously <br />required) <br />On October 17, 2012, Water Board agreed that the data from the three existing wells beyond <br />County property were sufficient to delineate the extent of groundwater impact. The violation for <br />failing to delineate the extent of groundwater impact has not been rescinded. <br />I <br />Eli <br />n <br />u <br />[I <br />In the session of April 11 and 12, 2013; the Regional Water Quality Control Board issued a Cease <br />and Desist Order requiring closure of the un -closed portion of the Corral Hollow Landfill, <br />installation of additional landfill gas collection wells, installing two additional perimeter landfill <br />gas migration monitoring wells, and establishing the timeline for future corrective action, if <br />needed. <br />On January 25, 2013, the County submitted an Engineering Feasibility Study for Corrective <br />Action Alternatives Evaluation establishing criteria and timeline for future corrective action. <br />On May 20, 2013, field work related to the construction of the closure cap began, after review of <br />preliminary tests of proposed geofabrics. <br />On August 9, 2013, construction of the closure project was substantially complete. Hydroseeding <br />of the disturbed surfaces was postponed until weather was more suitable for seed germination. <br />On August 32, the two additional perimeter LFG migration monitoring wells were completed, the <br />installation of which was documented in a Brief Technical Report. <br />On September 6, 2013, the County submitted a Brief Technical Report, documenting the <br />significant features of closure cap construction and the installation of the two additional perimeter <br />LFG migration monitoring wells. <br />Corral Hollow Sanitary Landfill <br />3rd Quarter 2013 Groundwater Monitoring <br />8 Department of Public Works/Solid Waste <br />County of San Joaquin — October 15, 2013 <br />