Laserfiche WebLink
• Table 14 <br /> Evaluation Criteria for Corrective Action Alternatives <br /> Evaluation Criteria Weight Factor <br /> Effectiveness 10 <br /> Constructability 8 <br /> Serviceability 6 <br /> Capital Cost 6 <br /> O&M Cost 3 <br /> 5.2 CAPITAL COSTS <br /> The capital cost estimates that were prepared for each remedial alternative were compared <br /> and ranked. The cost estimates were based on cost-estimating guides, generic unit costs, <br /> vendor pricing information, and engineering judgment. The system cost ranges and their <br /> respective ratings are as follows: <br /> Table 15 <br /> Capital Cost Scoring Criteria <br /> Basis Score <br /> Capital Costs less than$100,000 9-10 <br /> Capital Costs from$100,001 to$250,000 7-8 <br /> Capital Costs from$250,001 to$500,000 5-6 <br /> Capital Costs from$500,001 to$750,000 3-4 <br /> Capital Costs from$750,001 to$1,000,000 1-2 <br /> Capital Costs More than$1,000,000 0 <br /> 5.3 O&M COSTS <br /> Anticipated yearly 0&M costs were compared and ranked. The cost estimates were based <br /> on cost-estimating guides, generic unit costs, vendor pricing information, and engineering <br /> judgment. The system cost ranges and their respective ratings are as follows: <br /> Engineering Feasibility Study Geo-Logic Page ■ 29 <br /> Corral Hollow Sanitary Landfill A S S O C I A T E S <br /> January 25,2013 <br />