Laserfiche WebLink
• As envisioned, the County would complete the proposed corrective actions by the end of <br /> 2013. A two-year monitoring period would follow to monitor VOC concentrations at the <br /> point of compliance. If VOC concentrations decrease during this period, then monitoring <br /> would continue. If VOC concentrations do not change or increase during this period, then <br /> the County would follow the course of corrective actions and monitoring periods (Figure 12). <br /> This course of action would continue until water quality protection standards are met. <br /> 7.0 LIMITATIONS <br /> This EFS is based on the limited data described above and referenced herein. Geo-Logic <br /> Associates should be notified of any conditions that differ from those described herein since <br /> this may require a re-evaluation of the data, conclusions and proposed remedial alternatives <br /> presented herein. This report was not prepared for use by other parties and projects other <br /> than those named or described above. It may not contain sufficient information for other <br /> parties or other purposes. <br /> This report was prepared in accordance with generally accepted geotechnical and <br /> hydrogeologic practices and in accordance with all current and applicable state of California <br /> • regulations, and makes no other warranties, either expressed or implied, as to the <br /> professional data presented in it. <br /> • <br /> Engineering Feasibility Study Geo-Lo Page ■ 34 <br /> Corral Hollow Sanitary Landfill w s s o c I Ars sg <br /> January 25,2013 <br />