Laserfiche WebLink
TABLE 9B <br /> CAPITAL COST ESTIMATE SUMMARY-LANDFILL GAS EXTRACTION SYSTEM EXPANSION <br /> CORRAL HOLLOW SANITARY LANDFILL ENGINEERING FEASIBILITY STUDY <br /> Parameter Unit Cost Quantity Cost <br /> Mobilization/Demobilization $10,000 LS $10,000 <br /> Landfill Gas Well Construction(per foot) $100 189 $18,900 <br /> Wellhead Assembly(each) $2,500 7 $17,500 <br /> Laterial Pipeline(per linear foot) $4.60 400 $1,840 <br /> Trench(per linear foot) $12 400 $4,800 <br /> Field CQA(per day) $1,200 14 $16,800 <br /> Construction Subtotal $69,840 <br /> Engineering/Project Management 10% $6,984 <br /> Contingencies 15% $10,476 <br /> County Administration/Oversight 10% $6,984 <br /> Permitting/Regulatory Oversight 5% $3,492 <br /> Construction Total $97,776 <br />