My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_7
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2013_7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:01:31 AM
Creation date
7/3/2020 11:06:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_7
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2013_7.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> TABLE 13A <br /> CONCEPTUAL GROUNDWATER EXTRACTION AND GAC SYSTEM <br /> CORRAL HOLLOW SANITARY LANDFILL ENGINEERING FEASIBILITY STUDY <br /> Parameter Parameter Value <br /> Spacing between wells(ft) 100 <br /> Total number 9 <br /> Diameter of wells(inches) 4 <br /> Extraction Pump,maximum gpm,each 10 <br /> Total depth of wells(ft.) 105 <br /> Total Dynamic Head(TDH) 110 <br /> Extraction Pump(HP)each 1 <br /> No.of compressors 3 <br /> Compressor capacity(scfm) 16 <br /> Compressor HP each 7.5 <br /> Aboveground piping,extraction system,total(ft) 1,900 <br /> Aboveground piping to discharge,total(ft) 1,450 <br /> Influent equalization tank(10,000 gallons) 1 <br /> GAC Influent transfer pumps(25 gpm,2 HP)with level switches 2 <br /> Pre-filtration system,pressure bag filter 2 <br /> GAC vessels(750 pounds) 2 <br /> GAC replacement frequency yearly <br /> Backwash volume(monthly) 2000 gallons <br /> 2000 gallon HDPE Effluent surge tank 1 <br /> Total operating system horse power 34.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.