Laserfiche WebLink
CALTRANS RIGHT-OF-WAY EXPLANATION: <br /> (APPROX) 1 O EMP GROUNDWATER MONITORING WELL <br /> • # + (MONITORED 3/26/2012) <br /> (20 DEEP AQUIFER GROUNDWATER MONITORING WELL <br /> SHALLOW AQUIFER GROUNDWATER MONITORING WELL <br /> (219.63) ?�O ® (MONITORED 1/23/2012) <br /> MW—10 TEMPORARY SHALLOW AQUIFER GROUNDWATER <br /> �'Lj�,� MONITORING POINT (OCTOBER-NOVEMBER 2011) <br /> MW-9A ST �� GAS MONITORING WELL <br /> (215.13) F <br /> ® SURFACE WATER SAMPLING POINT <br /> S80 A STORM WATER (NPDES) SAMPLING POINT <br /> 216.07) (230.52 OCTOBER 2011, JANUARY 2012 AND MARCH 2012 <br /> GROUNDWATER ELEVATION (FEET ABOVE MSL) <br /> / CONTOUR LINE SHOWING OCTOBER 2011, JANUARY <br /> 00 o MW-11 /225 2012 AND MARCH 2012 GW POTENTIOMETRIC <br /> SURFACE ELEVATIONS (CONTOUR INTERVAL = 5 FEET) <br /> HIGH PRESSURE 2S 0.0�, DIRECTION AND GRADIENT (ft/ft) OF GW FLOW <br /> PETROLEUM PIPELINE <br /> (APPROXIMATE LOCATION) <br /> i ? j <br /> (230.52) <br /> MW-9 <br /> W_v1_mw- <br /> r <br /> MW-11 1A <br /> (233.73) s„ (222.41) <br /> • `� i� - \. � � (235.74) 4 <br /> B � <br /> APPROXIMATE LIMIT OF ; >, <br /> CORCORAN CLAY GW- <br /> VTI-4(28; <br /> MW 1 <br /> W GRAPHIC SCALE <br /> / / 100 0 50 100 200 <br /> GORRAL HOLLOW LANDFILL. ;� /J� ' \ yin feet) <br /> ��° -� 1 inch - 200 ft. <br /> WATER <br /> SUPPLY WELL 2t <br /> LfMITS O��REFUSE% FIGURE 3 <br /> r <br /> i <br /> SHALLOW AQUIFER GROUNDWATER EQUIPOTENTIAL CONTOURS <br /> ENGINEERING FEASIBILITY STUDY <br /> CORRAL HOLLOW SANITARY LANDFILL <br /> ' I J- ,; J RETENTION POND SAN JOAQUIN COUNTY, CALIFORNIA <br /> Geo-Logic Associates <br /> <D !� z CORRAL HOLLOW CREEK <br /> Geologists, Hydrogeologists, and Engineers <br /> DRAWN BY: DATE: JOB NO. <br /> VL JANUARY 2013 2011-115 <br />