Laserfiche WebLink
CALTRANS RIGHT—OF—WAY <br /> (APPROX) EXPLANATION: <br /> • PROPOSED NEW LANDFILL GAS EXTRACTION WELL <br /> • LANDFILL GAS EXTRACTION WELL INSTALLED IN 2008 <br /> • EXISTING LANDFILL GAS EXTRACTION WELL <br /> ST�TF <br /> S� <br /> O <br /> HIGH PRESSURE <br /> PETROLEUM PIPELINE <br /> (APPROXIMATE LOCATION) <br /> I <br /> NEW LFG WELLS ATTACHED <br /> TO EXISTING LFG SYSTEM <br /> GRAPHIC SCALE <br /> 100 0 50 100 200 <br /> CORRAL HOLLOW LANDFILL, / � � ij'��� � �� (in feet) <br /> 1 inch = 200 ft. <br /> / krMITS ,0F REUSE' FIGURE 8 <br /> = � <br /> PROPOSED LANDFILL GAS EXTRACTION SYSTEM ENHANCEMENTS <br /> ENGINEERING FEASIBILITY STUDY <br /> CORRAL HOLLOW SANITARY LANDFILL <br /> SAN JOAQUIN COUNTY, CALIFORNIARETENTION POND <br /> Geo-Logic Associates <br /> CORRAL HOLLOW CREEK <br /> Geologists, Hydrogeologists, and Engineers <br /> i <br /> DRAWN BY: DATE: JOB NO. <br /> VL JANUARY 2013 2011-115 <br />