Laserfiche WebLink
-Corral Hollow Sanitary Landfill ILiaration Monitoring Wells Page 6 of 6 <br /> From: Yekta, Gino [mailto:GYekta@CIWMB.ca.gov] <br /> Sent: Wednesday, March 14, 2007 11:56 AM <br /> To: Robert McClellon [EH] <br /> Cc: Wochnick, Michael; Todd Del Frate <br /> Subject: Corral Hollow Sanitary Landfill inspection <br /> The latest inspection received at the Board dated 12/27/06 indicates <br /> that all of previous ACs (inspection dated September 6, 2006) have been <br /> cleared; however, the issue with ponding which was indicated as an AC <br /> still remains. Furthermore, it had been stated in the same inspection <br /> that GW6 (intermediate and shallow) are plugged; however, there is no <br /> mention of this problem being taken care of by the operator during the <br /> latest inspection of December 2006. Gas monitoring from this probe <br /> apparently was conducted during December 2006 inspection and the results <br /> have been stated as below 5%. Are the results reliable due to LEA's <br /> suggestion during September 2006 inspection that GW6 had been plugged. <br /> Was there a reason to monitor only probes 3, 6, and 7 and not the <br /> remaining probes at the site? <br /> Call or e-mail if you have any questions. <br /> «CH-4th Qtr 2006.xls>> <br /> 3/28/2007 <br />