My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (1/08 TO 6/08)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (1/08 TO 6/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:38:57 PM
Creation date
7/3/2020 11:06:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (1/08 TO 6/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2008.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />The front gate on Waverly Rd is the main access gate to the site. The <br />drilling location of the wells is accessible through gravel roads during winter <br />months. The landfill foreman will ensure all roads will be assessable during <br />the winter months. All other access within the site shall be coordinated with <br />the Landfill foreman. <br />Water for construction is available on site from the storm water retention <br />pond. The contractor shall arrive on site with water tanks full. <br />B. Corral Hollow Sanitary Landfill <br />Corral Hollow Landfill is a closed landfill. The working hours at this site <br />shall be from 7.30 am to 5.30 pm. The landfill's perimeter is gated to <br />prevent illegal dumping and trespassing. The Engineer will provide the <br />contractor with the landfill's main entrance gate key. The Contractor shall <br />at all times lock the main gate at the end of each working day. <br />The well drilling location is easily accessible from the landfill paved road. <br />Water for construction is available on site at the pump station. The <br />contractor will be shown the operation of the pump. <br />1.05 MOBILIZATION /DEMOBILIZATION <br />A Mobilization shall include <br />Delivering to the landfill site and work areas all necessary <br />uncontaminated equipment, tools, materials and supplies in good <br />working order. <br />2 Establishing a work force sufficient to commence and sustain the scope <br />of work. <br />3 Providing the driller's job foreman with a working cell phone. <br />B Demobilization shall include: <br />Removing from the landfill site and work areas all equipment, tools, <br />surplus materials and supplies and debris generated by the well <br />installation process. Work shall be considered complete when all <br />construction materials, debris, and equipment are removed from the <br />sites, and boring locations are left clean in condition. During the <br />boring and well construction process, all debris shall be disposed of in <br />a contractor provided container, or removed from the site, and the site <br />left in a neat and orderly condition on a daily basis. <br />Soil Gas Monitoring Well Specs San Joaquin County -Public Works <br />Foothill Sanitary Landfill & 4 Solid Waste Division <br />Corral Hollow Sanitary Landfill Printed 10/10/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.