My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1978-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1978-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 5:56:48 PM
Creation date
7/3/2020 11:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1978-1992
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1978-1992.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
635
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 6 <br /> Review (10/89), RDSI (3/90), Draft Permit (10/91)) this site has not been issued WDRs. ` <br /> RWQCB staff verbally indicated (11/15/91) that WDRs may be issued by 2/92. ) <br /> 14 CCR 17616- RDSI <br /> The 8/77 RDSI has been updated and amended several times (11/88, 9/89, 3/90) . As <br /> noted under PRC 44014(b) above, the RDSI must be updated to reflect all current operations <br /> at the site (operating hours, tonnage, acreage, etc. ) and to thoroughly and completely <br /> address each section (a-1) of CCR 18222. A thorough description of the City's (Public Works <br /> Department) use of the landfill for the storage/stockpiling of asphalt and concrete (rip- <br /> rap) must also be included in the RDSI. The use of the landfill for the temporary storage <br /> of dirt from a construction project needs to be addressed. <br /> 14 CCR 17710- Grading of Fill Surfaces <br /> Several areas of depression and subsidence were observed (see attached map) providing <br /> areas for ponding of storm water. The methods of stockpiling cover (southwest of the <br /> current active face) and rip-rap (see attached map) do not provide for the lateral run-off <br /> of water. Of particular concern is a groundwater monitoring well located in a depression in _ <br /> the southwest portion of the landfill along French Camp Slough. <br /> (Noises P. Giambastiani of Gambi Enterprises provided an agenda from a "Landfill Operation <br /> Meeting" (10/14/91) where "Projects to Accomplish" concerning slope grading were identified <br /> and discussed. Mr. Giambastiani indicated that a grading plan would be developed and <br /> implemented in the near future. ) <br /> 14 CCR 17682- Cover <br /> On the day of the inspection it was observed that adequate cover had been placed on <br /> the uppermost surface of the previous day's waste but had not been placed over the most <br /> forward reaches of the active face. This standard requires daily cover, compacted to a <br /> minimum thickness of six inches, to be placed over all surfaces of waste for sites receiving <br /> over 50 tpd. <br /> 14 CCR 17684- Intermediate Cover <br /> Some exposed waste was observed in areas of intermediate cover (see attached map). <br /> 14 CCR 17704- Leachate Control <br /> Possible ground-water contamination was reported in the "Verification Monitoring <br /> Program and Report of Waste Discharge, French Camp Landfill, 6/29/90." The RWQCB provided <br /> comments to this report on 8/28/90 and requested the operator to respond by 9/17/90 so that <br /> WDRs, including a Monitoring and Reporting Program, for the facility could be drafted. <br /> The 3/90 RDSI states, "the sloughs on three sides of the site generally provide for <br /> containment and control of leachate." Board staff requests clarification on this <br /> "containment and control" method. <br /> 14 CCR 17709- Contact with Water <br /> The 3/90 RDSI reports that "refuse was encountered in Boring MW-1 to a depth of 37 <br /> feet, which is approximately 4 feet below first-encountered ground water. This indicates <br /> that ground water is in contact with the refuse and a portion of the landfill." The <br /> remediation of this violation needs to be addressed by the RWQCB in the forthcoming WDRs. <br /> 14 CCR 17777- Final Site Face <br /> This standard.-requires that the slope of those portions of the fill which will be the <br /> final exterior surface shall not be steeper than approximately 300. Using a clinometer, <br /> slopes of greater than 30° were found along both the French Camp and Walker sloughs (see <br /> attached map) . <br /> Waste Management Special <br />
The URL can be used to link to this page
Your browser does not support the video tag.