Laserfiche WebLink
MONITORING AND REPORTING PROGRAM 4 <br /> FOR CITY OF STOCKTON <br /> FRENCH CAMP LANDFILL <br /> CLASS III LANDFILL <br /> SAN JOAQUIN COUNTY <br /> D. REQUIRED MONITORING PROGRAMS <br /> 1. Solid Waste Monitoring Program <br /> Nonhazardous Solid Waste Monitoring <br /> The Discharger shall monitor all wastes discharged to the Class III landfill modules on <br /> a monthly basis and report to the Board as follows: <br /> Reporting <br /> Parameter Units Frequency <br /> Quantity discharged cubic yards or tons Quarterly <br /> Type of material discharged --- Quarterly <br /> Source(s) of material discharged --- Quarterly <br /> Minimum elevation of discharge feet & tenths MSL Quarterly <br /> Capacity of landfill/module remaining percent Annually <br /> 2. Evaluation Monitoring Program <br /> The Discharger shall collect and analyze all data necessary to assess the nature and <br /> extent of the release near MW-I. This assessment shall include a determination of the <br /> spacial distribution and concentration of each COC throughout the zone affected by the <br /> release. In conjunction with the assessment the discharger shall monitor ground water <br /> to evaluate changes in water quality resulting from the release. Based on the data <br /> collected the discharger shall submit an engineering feasibility study for corrective <br /> action required pursuant to Subsection 2550.8(k)(6) of Chapter 15. <br /> For each monitored medium. all Monitoring Points assigned to evaluation monitoring <br /> and/or corrective action and all Background Monitoring points shall be monitored once <br /> each calendar quarter for the Monitoring Parameters listed in this Program. The <br /> Discharger shall report, in writing, to the regional board on the effectiveness of the <br /> corrective action program. The Discharger shall submit these reports at least semi- <br /> annually. <br /> For any given monitored medium. a sufficient number of samples shall be taken from <br /> all Monitoring Points and Background Monitoring Points to satisfy the data analysis <br /> requirements for a given Reporting Period, and shall be taken in a manner that ensures <br /> sample independence to the greatest extent feasible. <br />