Laserfiche WebLink
SOIL GAS PROB CONSTRUCTION FIELD R ORT <br /> LOCATION: DRILLING SUMMARY: <br /> Total Depth: 10, <br /> Borehole Diameter: 7—inches <br /> Drill Crew: James Rodriguez <br /> Leo Praef <br /> ST ET: <br /> Steel Standpipe and Rig: CME-75 <br /> Locking Well Cover Bit(s): <br /> Drilling Fluid: N/A <br /> Top of Casing Surface Casing: Steel Standpipe <br /> 1'7 Rubber Stopeer <br /> ..........).......... <br /> CONSTRUCTION TIME LOG: <br /> TASK START FINISH <br /> DATE I TIME DATE I TIME <br /> 1/4!' O.D., 3/16" I.D. Teflon`" Tubing Drilling: 3/1711.600. 3/17 1640 <br /> Casing: <br /> 3' <br /> Type: 1" Sch. 80 PVC Geophys. Logging N/A <br /> Amount: 6'-t' <br /> 10' Casing: 3/17 1640 3/17 1645 <br /> Backfill Material: <br /> Type: 6—Sock Sand Cement Grout Filter: 3/17 1645 3/17 1650 <br /> Amount: Development: <br /> Seal: <br /> Type: Bentonite Pellets Seal: 3/17 1650 3/17 1655 <br /> -- ---- Amount: 2 1/2 Gals. <br /> 1" Rubber Stopper Backfill: 3/18 1415 3/18 1420 <br /> Filter Pack- <br /> Standpipe: 3/181 142013/181 1425 <br /> Type: Lonestar 03 and/or 2112 <br /> Amount: 175 lbs. <br /> 5 <br /> NOTES: <br /> Well Screen: <br /> V Sch. 80 PVC 0.02-inch Machine Slotted <br /> Type:Amount: 5. dia = diameter <br /> feet <br /> Bottom Plug: inches <br /> 0 Type: I" Sch. 80 PVC Threaded <br /> Dimensions in: Feet and inches <br /> PROJECT NO. WELL NO. DATE: THE <br /> 394-0028-02 SGP-1 1 3/17/94 <br /> PROJECT: GEOLOGIST: TT <br /> FRENCH CAMP LANDFILL KEVIN CLUTTER 7, TWINING. <br /> SOIL GAS PROBES DISK NO.: /EST.1898 LABORATORIES , INC . <br /> 39400283 FRESNO/MODESTO/VISALIA/BAKERSFIELD <br />