My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1994-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2021 1:51:44 PM
Creation date
7/3/2020 11:06:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-1996
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1994-1996.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Stockton TL# 394-0028-02 <br /> March 10, 1994 Page 3 <br /> 4.0 PROPOSED FIELD ACTIVITIES <br /> Proposed field activities are summarized in the following <br /> subsections. Standard operating procedures (SOPS) , relevant to the <br /> field activities, are described in Appendix A. <br /> 4. 1 Gas Probe Installation <br /> Twining proposes to drill eight soil borings to a depth of 15 feet <br /> BSG using 6-5/8-inch diameter hollow-stem augers. The number of <br /> borings is based on the spacing of probes at approximately 1,000 <br /> feet along the perimeter of the landfill. Soil samples will be <br /> collected at five-foot intervals beginning at five feet BSG for <br /> lithologic purposes only. A Twining geologist will log the soils <br /> in accordance with the Unified Soil Classification System. Drill <br /> cuttings will be stored in California Department of Transportation <br /> (DOT)-approved 55-gallon drums. Soil disposal will be the <br /> responsibility of the client. <br /> The gas probes will be constructed of 1-inch diameter schedule 80 <br /> polyvinyl chloride (PVC) well casing and 0. 02-inch machine slotted <br /> well screen. Casing and well screen will be flush threaded. Each <br /> gas probe will be screened from 10 to 15 feet BSG. Rubber stoppers <br /> will be placed at the top of the screened section and at the top of <br /> the casing. Teflonu' tubing will extend through the rubber stoppers <br /> from approximately one foot below the bottom stopper to <br /> approximately one foot above the top stopper. Samples will be <br /> obtained through the Teflon TM tubing. <br /> Coarse-grained sand or pea gravel will be placed from the bottom of <br /> the boring to approximately two feet above the top of the machine <br /> slotted casing. Approximately one foot of bentonite pellets will <br /> be placed on top of the filter pack, and the remaining annular <br /> space will be filled with a sand-cement grout. The bentonite <br /> pellets will be hydrated prior to the placement of the grout. <br /> Steel standpipes will be installed to approximately 1.5 feet above <br /> ground surface, secured in place with concrete, and the lid will be <br /> secured with a lock. <br /> Drilling and well installation activities will be supervised by a <br /> Twining geologist. The Twining geologist will be working under the <br /> direct supervision of a California registered geologist. Twining <br /> understands that the SJCEHD requires oversight of grouting <br /> activities and that no charge will be applied for one hour or less <br /> per well . Twining anticipates completing the grouting for well <br /> abandonment and installation within the specified time frame. <br /> 4.2 Soil Gas Sampling <br /> Methane levels in the gas probes will be measured using a methane <br /> calibrated meter following installation. The results will be <br /> logged and included in the report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.