Laserfiche WebLink
City of Stockton French Camp Landfill <br /> Groundwater Investigation <br /> Task 6 Deliverables <br /> An example of the Task 6 deliverable table of contents,Report of Findings,is presented on the <br /> following page. <br /> A draft report of findings will be prepared for the City's review. A meeting between City and CDM <br /> project staff is proposed to discuss the draft report. Review comments will be generated at the <br /> meeting and incorporated into the final draft of the Report to be submitted to the CVRWQCB. <br /> Report of Findings-Table of Contents <br /> 1.0 Introduction <br /> 1.1 Site Location and History <br /> 1.2 Groundwater Investigation Objectives <br /> 1.3 Report Organization <br /> 2.0 Background <br /> 2.1 Environmental Setting <br /> 2.2 Previous Investigations <br /> 2.3 Existing Data <br /> 3.0 Field Work <br /> 3.1 Groundwater Monitoring Well installation <br /> 3.2 Groundwater Sampling and Analysis <br /> 3.3 Surface Water Sampling and Analysis <br /> 4.0 Findings <br /> 4.1 Groundwater Occurrence and Movement <br /> 4.2 Water Quality <br /> 5.0 Recommendations <br /> 5.1 Conclusions <br /> 5.2 Implementation Plan <br /> Appendix A-Analytical Data <br /> Appendix B-Boring Logs and Well Construction Details <br /> Schedule <br /> Work will begin after receipt of the Notice to Proceed. Task 1 activities,review of the available <br /> historical data on disposal operations,and preparation of the revised proposal for submittal to the <br /> CVRWQCB,will be completed prior to initiation of field activities. CDM will mobilize to the field <br /> after completion of the Health and Safety Plan and receipt of concurrence from the CVRWQCB on <br /> the proposed approach. <br /> Well installation and development activities will take 15 working days including equipment <br /> mobilization. Sampling tasks will be conducted within five days of the completion of the final <br /> monitoring well. Data analysis and report preparation will conclude with a draft report for the <br /> City's review 20 working days after receipt of the analytical data from the laboratory. Based upon a <br /> standard turn around time,analytical results will be available 14 days after the samples have been <br /> received by the laboratory. <br /> Review comments from the City on the draft report will be incorporated within five days of receipt <br /> of comments. The final report will be transmitted to the CVRWQCB. <br /> CDM Camp Dresser&McKee 7 <br /> MM50owoe <br />