Laserfiche WebLink
e <br /> Exhibit <br /> Fee Schedule <br /> The costs to perform the scope of work are presented below on a task-by-task basis. Project charges <br /> are separated by labor hours,other direct charges,and outside services;drillers and analytical <br /> services. Labor charges will be based on the attached Billing Rate Schedule dated January, 1996. <br /> Task 1 - Development of Revised Program <br /> Labor $5,150 <br /> ODCs 100 <br /> Total $5,250 <br /> Task 2 - Installation of Monitoring Wells <br /> Labor $11,600 <br /> ODCs 9,300 <br /> Drilling Services 21,100 <br /> Total $42,000 <br /> Task 3 - Monitoring Well Development <br /> Labor $4,500 <br /> ODCs 900 <br /> Drilling Services x3m <br /> Total $8,700 <br /> Task 4 - Ground and Surface Water Sampling and Analysis <br /> Labor $2,300 <br /> ODCs 400 <br /> Laboratory 15.400 <br /> Total $18,100 <br /> CDM Camp Dresser&McKee 1 <br /> W961250CV010 <br />