My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_2000-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 11:34:41 AM
Creation date
7/3/2020 11:06:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2011
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_2000-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III.A.9. Representative Cross <br />Five representative landfill cross sections are shown ort <br />Appendix B, <br />Sections <br />Drawing P5. These sections show the existing landfill, the <br />CEP Dwg. P5 <br />vertical and horizontal expansion phases, and the final landfill <br />grade. Sections A, B, C, and D are cut north-south through a <br />leachate collection trench and sump for Phases I, II, III, and IV <br />respectively. Section F is cut east-west through Phases I, II, <br />III, and IV showing the drainage slope to the leachate <br />collection trenches, the top of the landfill is shown as a <br />projection beyond the section cut. <br />Sections show specific design elements of the liner, leachate <br />collection system, cover system, surface water system are <br />discussed in Section 1- below. <br />III.A.10. Design Details <br />23 CCR 2542 (Liner <br />Liner S sy tem: Liner system is a composite liner consisting of <br />Appendix B, <br />System) <br />a 2 foot clay liner (max. permeability 1 x 10-7 cm/sec) overlaid <br />CEP Dwg. P6 <br />by a geomembrane. For final design, a geosynthetic clay liner <br />Appendix I, FDSR <br />(GCL) may be substituted for the 2 foot clay liner. See <br />Sec. 1.3.3, Pages <br />Drawing P6 for typical liner details. <br />1-8 to 1-9 <br />14 CCR 17773, <br />Final Cover - Existing Landfill: Final covering existing landfill <br />Appendix B, <br />23 CCR 2581 (Final Cover) <br />areas would consist of a 2-foot foundation layer and a 1-foot <br />CEP Dwg. P6 <br />minimum soil barrier (max. permeability 1 x 10-6 cm/sec) with <br />Appendix I, FDSR <br />a 1-foot minimum topsoil layer. <br />Sec. 1.5.3 Page 1-17 ' <br />Final Cover - Expansion Landfill: Final cover for expansion <br />landfill areas will consist of a composite cover system an 18 <br />inch foundation layer (max. permeability 1 x 10-6 cm/sec), a <br />geomembrane, and an 18 inch soil cover layer. For final <br />design, a geosynthetic clay liner (GCL) may be substituted for <br />the low permeability foundation layer or the soil barrier layer. <br />See Drawing P6 for typical cover details. <br />
The URL can be used to link to this page
Your browser does not support the video tag.