Laserfiche WebLink
MONITORING ANDEPORTING PROGRAM NO. 4 <br /> FORWARD INC. <br /> ALLIED WASTE INC. <br /> FOR CLOSURE OF <br /> FRENCH CANT MUNICIPAL SOLID WASTE LANDFILL <br /> SAN JOAQUINCOUNTY <br /> Units at the facility are those listed in Tables I through IV for the specified <br /> monitored medium, and Table V. The Discharger shall monitor all constituents of <br /> concern every five years, or more frequently as required in accordance with a <br /> Corrective Action Program. <br /> a. Monitoring Parameters <br /> Monitoring parameters are constituents of concern that are the waste <br /> constituents,reaction products, hazardous constituents, and physical <br /> parameters that provide a reliable indication of a release from a Unit. The <br /> monitoring parameters for all Units are those listed in Tables I through IV <br /> for the specified monitored medium. <br /> 3. Concentration Limits <br /> For a naturally occurring constituent of concern, the concentration limit for each <br /> constituent of concern shall be determined as follows: <br /> a. By calculation in accordance with a statistical method pursuant to §20415 <br /> of Title 27; or <br /> b. By an alternate statistical method acceptable to the Executive Officer in <br /> accordance with §20415 of Title 27. <br /> Concentration Limits have previously been established for Detection Monitoring <br /> Wells. The established Concentration Limits are listed in Table VI. <br /> 4. Point of Compliance <br /> The point of compliance for the water standard at each Unit is a vertical surface <br /> located at the hydraulically downgradient limit of the Unit that extends through <br /> the uppermost aquifer underlying the Unit. <br /> 5. Compliance Period <br /> The compliance period for each Unit shall be the number of years equal to the <br /> active life of the Unit plus the closure period. The compliance period is the <br /> minimum period during which the Discharger shall conduct a water quality <br /> monitoring program subsequent to a release from the Unit. The compliance <br /> period shall begin anew each time the Discharger initiates an evaluation <br /> monitoring program. <br />