My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_2000-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 11:34:41 AM
Creation date
7/3/2020 11:06:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2011
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_2000-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality,,Coptvp �9grd <br /> v Central Valley Region r`?°' ^F, WF <br /> M �- <br /> Robert Schneider,Chair p3 AUG I e PM �' l�Q <br /> Winston H.Hickox ' Gray Davis <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.swrcb.ca.-ov/rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,Califomia 95827-3003 <br /> Phone(916)255-3000-FAX(916)255-3015 <br /> 15 August 2003 <br /> Mr. Kevin Basso <br /> General Manager <br /> Forward Inc. <br /> 1145 West Charger Way <br /> Stockton, CA 95206 <br /> RESPONSE TO LANDFILL GAS CONTROL SYSTEM, VOLATILE ORGANIC COMPOUND <br /> MITIGATION WORK PLAN, FRENCH CAMP LANDFILL, SAN JOAQUIN COUNTY (CASE <br /> NO. 3032) <br /> We have reviewed the Landfill Gas Control System, Volatile Organic Compound Mitigation Work Plan <br /> French Camp Landfill(Work Plan) submitted on 12 August 2003. The Work Plan was prepared in <br /> response to a letter dated 14 May 2003 by the Regional Water Quality Control Board Staff(Staff). The <br /> Work Plan is a preliminary plan to capture and control landfill gas. The plan will be implemented if <br /> groundwater impacts from landfill gas increase after a landfill cap is installed at French Camp Landfill. <br /> The plan includes a landfill gas sampling plan for the post-closure period and proposes triggers to <br /> implement gas control measures. <br /> The proposed gas monitoring program consists of collecting quarterly samples from three down-gradient <br /> and one background gas probes. Gas detections will be considered significant if one of following three <br /> conditions occurres: methane greater than the explosive limit, two VOCs greater than their respective <br /> MDL, or one VOC detection greater than its PQL. If evaluation monitoring determines that landfill gas <br /> poses dthreat to groundwater then a phased construction of the gas control system will be implemented. <br /> Staff concurs with the proposed Work Plan and it will be incorporated in revised Waste Discharge <br /> Requirements (WDRs) for French Camp Landfill. WDRs for closure will be written when all <br /> components of the closure have been submitted and approved. <br /> California Environmental Protection Agency <br /> Ca Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your enerey costs,see our Web-site at http://www.swrcb.ca.gocirwgcb5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.