Laserfiche WebLink
Monitoring Report Compliance Checklist 3 <br /> Discharges Regulated by Title 27 and/or Part 258 <br /> RWQCB <br /> Reference Parameter Yes No N/A Reviewer Comment <br /> WDRs/MR.P/ Groundwater Monitoring <br /> Standard <br /> Provisions 1. Are all groundwater Field Parameters x <br /> (1993,1997,2000) Monitoring Parameter,and CDCs <br /> (if required) samples and analyzed? <br /> MW-2, -3, -9A, -9B, &-10A <br /> m. Have any groundwater concentration x equal or exceeded 1 or more <br /> limits been exceeded? If yes,identify inorganic parameter. MW-3, -5, <br /> in comments. -913,&-lA contain 1 or more <br /> n. Is there a description and graphical organic parameter. <br /> presentation of groundwater flow x <br /> direction and gradient? <br /> o. Monitoring Wells: Is there a <br /> description,method,and time x <br /> of water level measurement and <br /> well recovery time? <br /> p. Purging: Is there a description x <br /> of the purging method,purge <br /> pump and its placement,and <br /> field parameters? <br /> WDRs Annual Monitoring Report(when applicable) <br /> Standard <br /> Provisions q. Are all monitoring parameters X <br /> (1993,1997,2000) and COCs graphed so as to show <br /> historical trends at each Monitoring <br /> Point and Background Monitoring <br /> Point? <br /> X Not required for a quarterly <br /> r. Is all monitoring analytical data report. <br /> obtained in the last year presented <br /> in tabular form as well as on a 3.5" <br /> diskette? <br /> s. Is there a comprehensive discussion x <br /> of the compliance record and the <br /> result of any corrective actions? <br /> t. Is there a map showing the area x Waste is no longer discharged at <br /> the French Camp facility. <br /> and elevations in which filling has <br /> been completed during the past year <br /> and comparison to final closure <br /> contours? <br />