Laserfiche WebLink
Aute-15-06 O1 :49P P.O6 <br /> 13-17,13, The grout used to fill the well shall be allowed to shill over into the <br /> excavation, during the sealing operation,and fill it for a thickness of <br /> one foot and Ibrm a"cap"which has a diameter of at least one foot <br /> greater than the diameter of the originally drilled hole. <br /> 13.17.14. After the sealing operation and the sealing material have set,the <br /> excavation shall be filled with clean soil, <br /> 13.17.1 S. Any deviation from this section must obtain prior approval from the <br /> Director. <br /> FT Ira 4:1-02-003 Page 30 of 30 <br /> 9/17/21}x3 <br />