My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
COMPLIANCE INFO_2009-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 12:56:44 PM
Creation date
7/3/2020 11:08:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2014
RECORD_ID
PR0440007
PE
4434 - LANDFILL DISPOSAL SITE - POST CLOSURE
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1990-???.tif
Site Address
14750 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CalRecycle <br />Closed Disposal Site Inspection Report (188) <br />County of San <br />39 -AA -0003 ! 9/2/2011 ( LEA Periodic <br />Lane Sanitary Landfill <br />1/4 Mi E Of Jack Tone Road, Lodi <br />Natalia Subbotnikova <br />my Of San Joaquin Public Works <br />THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE IN APPLICABLE SECTIONS OF THE DIVISION 300E THE PUBLIC RESOURCES CODE (PRC) AND TITLE 14 AND TITLE 27 CALIFORNIA CODE OF REGULATIONS (CCR) <br />No Violations <br />or Areas of Concern <br />V A <br />Regulations <br />x <br />20750 - Site Maintenance <br />Comments: Deep probe in GW -10 did not function as intended. <br />P. Make the necessary repairs to provide adequate gas monitoring control measurements. <br />x <br />21150 - Drainage and Erosion Control <br />Comments: Large burrow holes were observed on the east side of the primary site and on the west site of the <br />secondary site. <br />a. Make the necessary repairs to the burrow holes and take measures to prevent further burrowing. <br />lnspe6tio6 Report Comments: <br />Notes: <br />A. The landfill gas extraction flare was operating at time of inspection. <br />B. Concentrations of gas probe measured the following for methane%: GW 4 - Shallow -0.0, Intermediate - 0.1, Deep - <br />1.1.; GW 8 - 0.0 (all three probes); GW 10 - 0.0 (all three probes). <br />C. Cut back tall weeds/grass within area of drive paths throughout the site to prevent fire hazards from vehicles. <br />D. The fence along east perimeter needs repair. Neighbors' dogs can easily enter the site through the fence. Make <br />necessary repairs/installation of fencing to provide site security. <br />E. Previous AC's cleared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.