Laserfiche WebLink
a <br /> California RegionalWater-Quality Control Board <br /> Central valley Region <br /> Robert Schneider,Chair <br /> V.Allston H.Hickox , - - - Gray Davis <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.sv--rcb.ca.gov/rw'qcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> 25 January 2002 <br /> Mr. W.Michael Carroll <br /> San Joaquin County Dept. of Public Works <br /> Solid Waste Division <br /> P.O. Box 1810 <br /> Stockton, CA 95201 <br /> NOTICE OF VIOLA77ON <br /> HARNEYLANE SAATTARYLANDFILL <br /> SAN.JOAQUIN COLWTY, Case No. 2598 <br /> An inspection of the subject facility was performed on 23 January 2002. Mr.Najee Zarif, San <br /> Joaquin County engineer, accompanied Board staff. During the inspection,evidence of ponding and <br /> differential settlement of the closed landfill's final cover was discovered. This is a violation of Title <br /> 27, California Code of Regulations,Division 1, Subdivision 2(Title 27), Section 21090. The <br /> attached Inspection Report,map, and digital photos are included in the record. <br /> According to Title 27, Section 21090(b)(1)(A)... In spite of differential settlement,the final cover of <br /> closed landfills ... shall be designed,graded,and maintained to prevent ponding and to prevent soil <br /> erosion due to high run-off velocities... and, (c) Throughout the post closure maintenance period, <br /> the discharger shall: (1) maintain the structural integrity and effectiveness of all containment <br /> structures, and maintain the final cover as necessary to correct the effects of settlement or other <br /> adverse factors, and(4) prevent erosion and related damage of the final cover due to drainage. <br /> Furthermore,§21090(b)(1)(E) Construction Quality Assurance(CQA) states that after July 18, <br /> 1997,both the initial construction of the final cover and any later repair work that involves the <br /> cover's low-hydraulic-conductivity layer shall be carried out in accordance with an approved CQA <br /> plan [see§20323 &§20324]. <br /> We require the County submit by 25 April 2002,a workplan describing how the County proposes to <br /> come into compliance with Title 27. The workplan must include before and after iso-settlement <br /> maps pursuant to Title 27, Section 21090(e)(2)Final Cover Surveys, and a time schedule(e.g., <br /> GANT chart) describing.specific dates when construction activities will begin and end. . <br /> California Environmental Protection Agency <br /> ;a Recycled Paper <br /> The energy challenge facing California is reaL Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and.cut your energy costs,see our Web-site at htrpJ/www.swrcb.ca.gov/rwgcb5 <br />